Laserfiche WebLink
3. PROJECT DESCRIPTION <br /> would be approximately 80,000 gpd during dry months; landscaping would require approximately <br /> 8 acre feet per year for approximately 17 acres of land;and water demand for the Ready Mix <br /> Plant would be approximately 25,000 gpd. <br /> The Applicant would use well water and recycled water from silt ponds for water supply. Well <br /> water would be used exclusively until silt ponds are established. Once the silt ponds are <br /> �. established,the Applicant would recycle the decanted waters from the silt pond for use in <br /> washing the sand and gravel; however it is anticipated that approximately 25 percent of the <br /> project's water requirement would be supplied from the well water. — <br /> A temporary silt pond would be built in the Phase IVB area by stripping the overburden from the <br /> Phase I area and creating a basin. The applicant would use well water at the rate of <br /> approximately 3.8 mgd to 8.9 mgd(based on a production range of 1.7 mty to 4.0 mty)until there <br /> is enough wastewater to be recycled in the temporary silt pond. Once water recycling begins,the <br /> applicant would only need to replenish the amount of water lost to evaporation and/or sold in the <br /> ` product. Once the silt pond is established, it is anticipated that only 0.28 mgd to 0.4 mgd of water <br /> supply would be supplied by well water. The volume of water needeg for replenishment is p I <br /> provided below. 9, p <br /> • Evaporation loss: The temporary silt pond in the Phase IVB area would measure 40 acres. <br /> Therefore,evaporation for the year(at 6 feet per year)would be 78.2 million gallons <br /> annually(240 acre-feet),or 214,200 gallons daily. <br /> • Production loss: Assuming seven percent loss in the product(i.e.,products will have an <br /> r average of 7 percent moisture when they leave the project site)at a production rate of <br /> 1.7 million tons per year,product loss would be approximately 210 million pounds of water <br /> annually,or 68,500 gallons of water daily. <br /> " • Total loss: By adding the evaporation and product losses the total water loss would be <br /> 282,700 gpd with a production rate of 1.7 million tons per year. With a production rate of t <br /> 4.0 million tons per year, the total loss would be 396,800 gallons of water daily. <br /> ` DUST CONTROL <br /> Sources of potential fugitive dust include: <br /> Aggregate Plant <br /> - Conveyor transfer points <br /> - Crushers <br /> - Screens(dry) <br /> - Load out bunkers <br /> Material being added to stockpiles via conveyor <br /> Yard <br /> - Internal gravel roads <br /> Loading of delivery trucks <br /> r RMC Pacific Vernalis Quany Mining and Reclamation Project 3-23 ESA 703015 <br /> Administrative Draft OR MBmti 2004 <br /> r <br />