Laserfiche WebLink
4. ENVIRONMENTAL ANALYSLS <br /> 4.4 TRANSPORTATION AND CIRCULATION <br /> movements. The analysis does not indicate that significant delays would be experienced by these <br /> turning movements, which will operate at acceptable levels of service. <br /> Intersection operation would be unsafe during foggy conditions, and it is recommended that truck <br /> traffic be precluded from utilizing this intersection for turning movements during foggy <br /> conditions. <br /> Intersection of Welty Road and SR 132 <br /> The existing traffic volumes indicate that the intersection of Welty Road and SR 132 was <br /> operating at acceptable level of service at the time the traffic counts were taken (January 2004), <br /> and the intersection is expected to continue to operate at an acceptable levels of service with the <br /> proposed project with either of the two proposed haul routes. Neither of the proposed haul routes <br /> would place project traffic on Welty Road. In the future without the project,the northbound <br /> approach to the intersection is expected to experience LOS F. The poor level of service is <br /> .. primarily the result of the difficulty that would be experienced by drivers on northbound Welty <br /> attempting to turn left. The future traffic volumes on Welty Road are expected to be minimal, <br /> and it is not anticipated that traffic signal warrants will be met. <br /> r <br /> Intersection of McCracken Road and SR 132 <br /> r <br /> Existing traffic volumes indicate that the intersection of McCracken Road and SR 132 was <br /> operating at acceptable levels of service at the time the traffic counts were taken(January 2004), <br /> and the intersection is expected to continue to operate at an acceptable levels of service with the <br /> r, proposed project with either alternative haul routes. Neither of the proposed haul routes would <br /> place project traffic on McCracken Road. In the future without the project,the northbound and <br /> southbound approaches to the intersection are expected to experience LOS F. The poor levels of <br /> service are primarily the result of the difficulty that would be experienced by drivers attempting <br /> to turn left or proceed across both travel directions of SR 132. The future traffic volumes on <br /> McCracken Road are expected to be minimal,and it is not anticipated that traffic signal warrants <br /> will be met. <br /> Interstate 5/SR 132 Interchange <br /> Freeway weaving and ramp analyses indicate that the interchange is expected to operate at <br /> acceptable level of service through the year 2025 with the implementation of the project based on <br /> the projected traffic volumes. <br /> Interstate 5/Interstate 580 Interchange <br /> ` Freeway weaving and ramp analyses indicate that the interchange is expected to operate at <br /> acceptable levels of service through the year 2025 with the proposed project based on the <br /> projected future traffic volumes. <br /> RMC Pacific Vemahs Quany Mining and Reclamation Pmjmt 4.4-15 FSA/203015 <br /> Administrative Dnft EIR March 2004 <br /> r <br />