Laserfiche WebLink
5. ALTERNATIVES <br /> Koster Road may potentially reduce visual impacts to residents located along Blewett Road and <br /> to those traveling along Blewett Road. <br /> Distinctive Environmental Characteristics <br /> The following summarizes potential impacts of the"Alternative Processing Plant Location' <br /> alternative: <br /> If the plant site were to be moved into Phase IV with access from Blewett Road,the impacts of <br /> traffic on the portion of Koster Road south of Blewett Road would be reduced.Truck traffic at the <br /> intersection of Blewett Road and Koster Road would be reduced since the trucks would enter and <br /> leave the site from Blewett Road and not be stopping or making turns at the intersection. Noise <br /> r. and air quality would remain the same because the number of truck trips per day would not <br /> change. However,the visual impacts would be increased as the structures and equipment <br /> associated with the plant site would be more visible for those traveling along Blewett Road. In <br /> addition,the plant site would be situated in closer proximity to the residence located adjacent to <br /> the east side of the project site,along Blewett Road. All other impacts would remain the same as <br /> those of the proposed project. <br /> If the plant site were to be moved to the east side of the project site, in the Phase VH or VIII <br /> areas,this would put the plant site further from Blewett Road and the residences located along <br /> Blewett Road. Visual impacts would be reduced for those living and traveling along Blewett <br /> Road. However, an access road from Blewett Road back to that portion of the project site would <br /> ` have to be constructed. This would create additional temporary construction impacts,including <br /> dust and noise. This location would put the entrance and exit to the project site to the east of <br /> several residences. This would increase truck traffic along Blewett Road and past several <br /> additional sensitive receptors that would not be affected with the proposed project. All other <br /> impacts would remain the same as those of the proposed project. <br /> If the plant site were to be moved further south along Koster Road into Phase II or III,there <br /> would be an increased buffer of land between the plant site and Blewett Road and the visual <br /> impacts would be reduced for those living and traveling along Blewett Road. However, since <br /> Koster Road crosses over the Delta Mendota Canal before these phases,the existing dirt road on <br /> the east side of the canal would need to be improved for truck traffic. This would create <br /> additional temporary construction impacts, including dust and noise. In addition, this location <br /> would put the plant site closer to a residence located on the west side of the Delta Mendota Canal, <br /> potentially increasing the visual and noise impacts to that sensitive receptor. All other impacts <br /> would remain the same as those of the proposed project. <br /> — <br /> — RMC Pacific Vemalis Quany Mining and Reclamation Project 5-3 ESA/203015 <br /> Adminisvative Dolt EIR March 2004 <br />