5. ALTERNATIVES <br /> reduction in the number of years that mining would occur. However,if there is a market the <br /> maximum amount of 4.0 mty of product would be mined and processed during the life of this <br /> alternative. Due to the reduction in the phases to be mined,the lifespan of the mining operations <br /> would he reduced to 15 to 36 years instead of the 25 to 60 years of the proposed project. If <br /> Phases V and VI were to be removed from the overall mining plan,the disturbance to Hospital <br /> Creek would be greatly reduced. This is discussed under Hydrology and Water Quality. <br /> Agricultural Resources <br /> Scenario 1: A reduction in the amount of material to be extracted from the proposed project site <br /> would not result in a reduction in the amount of prime farmland and farmland of statewide <br /> importance that would be taken out of production. All the proposed phases would continue to be <br /> mined under this Scenario. This scenario would result in similar impacts as the proposed project. — <br /> Scenario 2: A reduction in the number of phases to be mined would result in a reduction in the <br /> amount of prime farmland and farmland of statewide importance that would be taken out of -- <br /> production during the mining operations. However,not enough to reduce this impact from <br /> significant and unavoidable to less-than-significant. A portion of the site would remain in active <br /> agricultural production,and there would he a reduction in the amount of soil disturbance that — <br /> would impair the agricultural productivity of the site. This scenario would result in similar <br /> impacts as the proposed project. <br /> Transportation and Circulation <br /> Scenario 1: Traffic volumes would be less than those projected for the proposed project. A — <br /> reduction in mining operation would result in a reduction in the number of trucks traveling to and <br /> from the site on a daily basis over the life of the project. The proposed project would generate <br /> 160,000 truckloads per year,613 truckloads per day on average, with seasonal adjustment it <br /> would be 981 truckloads per day. The average truckloads per hour would be 123,with peak hour <br /> truckloads at 153. <br /> The projected traffic volumes for production(tons/year)of 1.7 mty would be 68,000 truckloads <br /> per year, and 261 truckloads per day, on average. With the seasonal adjustment for increases of _ <br /> truck trips during certain times of the year, the adjusted truckload per day would be 417. The <br /> average truckloads per hour would be 52, with the peak hour truckloads at 65. <br /> The projected traffic volumes for a production(tons/year) of 2.85 mty would be 114,000 <br /> truckloads per year,and 437 truckloads per day on average. With the seasonal adjustment for <br /> increases of truck trips during certain times of the year, the adjusted truckload per day would be — <br /> 699. The average truckloads per hour would be 87,with the peak hour truckloads at 109. <br /> Scenario 2: The reduction in the number of phases to be mined would reduce production years <br /> from 25 to 60 years to 15 to 36 years. However, the amount of material to be mined would <br /> remain the same as the proposed project. The projected traffic volumes for this production <br /> volume would be similar to the proposed project, but would occur over a shorter period of time. <br /> RMC Pacific Vemahs Quaay Mining and Reclamation Project 5-10 ESA/?03015 <br /> Administrative Dnft EOR Match 2004 <br />