Laserfiche WebLink
5. ALTERNATIVES <br /> TABLE 5-3(Continued) <br /> COMPARISON MATRIX OF THE PROJECT ALTERNATIVES <br /> Alternative 2 Alternative 2 <br /> Alternative 1 (Reduced Project (Reduced Project Alternative 3 <br /> (No Project Production) Production) (Off-Site Proposed <br /> Alternative) Scenario I Scenario 2 Alternative) Project <br /> Cultural Resources <br /> Damage to Previously Unidentified Buried Archaeological LS PS PS PS PS <br /> Remains During Project Construction <br /> Damage to Previously Unidentified Human Remains During LS PS PS PS PS <br /> Project Construction <br /> Hazards and Hazardous Materials <br /> Encounter unknown hazardous conditions LS PS PS PS PS <br /> Construction related releases of hazardous materials LS PS PS PS PS <br /> Above-ground fuel storage tank installation/Hazardous Materials LS LS LS IS LS <br /> Exposure to disease vectoring mosquitoes LS PS - PS PS PS <br /> Restricted pesticide use LS LS LS LS LS <br /> Exposure to asbestos and lead-based paint LS PS PS PS PS <br /> Visual Resources <br /> Adversely impact scenic views of the Coastal Range Mountains LS LS LS LS LS <br /> and San Joaquin Valley <br /> Conflict with adopted plans and policies LS PS PS PS PS <br /> SOURCE: ESA,2003 <br /> Key: ------._.. ......... ......... ___. __. ___. <br /> LS=Lass-than-Significant S=Significant U=Unknown +=Greater in magnitude <br /> PS=Potentially Significant SU=Significant and Unavoidable NA=Not Applicable -=Lesser in magnitude <br /> RMC Pocsc Vernalis Quarty Mining and Reclamation Project 5-24 FSA/203015 <br /> Administrative Draft Ent March 2004 <br />