Laserfiche WebLink
CHAPTER 5 <br /> Mitigation Monitoring and Reporting Program <br /> 5.1 Requirement <br /> CEQA states that when mitigation measures are required to reduce or avoid a potentially <br /> significant impact, a program for monitoring or reporting those measures shall be adopted by the <br /> Lead Agency(CEQA Guidelines 15097).The purpose of the mitigation monitoring and reporting <br /> program(ND4RP)is to ensure timely compliance with required mitigation measures. <br /> 5.2 Mitigation and Monitoring Reporting Program <br /> Table 5-1 lists the recommended mitigation measures,the person(s)responsible for monitoring <br /> compliance,and when monitoring will occur.The table may be signed and dated by the <br /> designated monitor when compliance has been verified. <br /> NNW <br /> Cemex Vemalls Quarry Mn ng end Re am bon Prged 5-1 ESA/2D3015 <br /> ilnel EnAmm nW Ir d RePon June 2008 <br />