My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cemex Vemalis Quarry Mining and Reclamation Project <br /> TABLE 5.1 <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> CEMEX VERNALIS QUARRY PROJECT <br /> Mitigation Measure Responsible Party Monitor Timing Sign Off <br /> 4.3 AGRICULTURAL RESOURCES <br /> 4.3.4:The Reclamation Plan for the proposed project shall be modified to incorporate elements of a Applicant CDD Prior to approval of <br /> comprehensive soil resource extraction,maintenance and reintroduction plan.The ultimate goal of the first <br /> the plan will be to ensure the future productivity of the sail resource and its availability for future Improvement Plan <br /> agricultural cultivation in compliance with the performance standards for prime agricultural land <br /> reclamation,Title 14 of the California Code of Regulations,Section 3707 and 3711.At a minimum, <br /> the plan shall consist of the following elements: <br /> a. Existing Conditions.This element of the plan shall identify the existing soil fertility in terms <br /> of pertinent soil physical,chemical,and biological attributes.It will identify the soil <br /> attributes that are most able to be maintained during the 30-to 60-year life of the mining <br /> plan and will be used as the baseline,with which to compare the soil resource following <br /> reclamation and better enable rehabilitation of the mining site. <br /> b. Soil Harvesting and Transport.This element vdll identify appropriate soil harvesting and <br /> transport methods to limit the compaction of the soil resource,maintain the existing soil <br /> profile,and to the extent feasible during transport,ensure the viability of existing soil biota. <br /> c. Soil Stockpile Maintenance and Monitoring.This element of the plan will outline <br /> performance standards and monitoring procedures for the soil stockpiles over the 30-to <br /> 60-year life of the proposed mining plan.In general,this element will identify suitable <br /> vegetative species(e.g.,legumes)to be planted on the soil stockpiles,monitoring <br /> protocols for any periodic analytical analysis determined necessary,and procedures for <br /> conducting periodic soil microbiology cultures.This element volt also identify watering <br /> requirements for the stockpiles and protocols for pest and invasive species control. <br /> d. Reclamation Activities.Following the completion of mining activities,site reclamation shall <br /> consist of preparing the site for cultivated agriculture.Soil tests and climatic studies of the <br /> reclaimed sites shall be systematically performed to ensure that soil compatibility is <br /> suitable for a production level present prior to mining.An evaluation of deep ripping the pit <br /> Floor prior to the reintroduction of topsoil should be conducted to determine if such <br /> procedures would help to alleviate anticipated drainage limitations.In addition,the <br /> applicant shall minimize application of nitrogen and phosphorus fertilizers due to the close <br /> proximity of(shallow)groundwater.A complete agronomic evaluation shall be conducted <br /> prior to plantings to establish rates of fertilizer and herbicide applications. <br /> Camey Vanulis Quarry harms and Radamaeon Project 5-2 ESA 1203015 <br /> Final EnAronnew-'Impact Repw June 2008 <br /> I ( <br />
The URL can be used to link to this page
Your browser does not support the video tag.