Laserfiche WebLink
TABLE OF CONTENTS <br /> Cemex Vernalis Quarry Mining and <br /> Reclamation Project <br /> Pace <br /> Executive Summary ES-1 <br /> 1. Introduction 1-1 <br /> 1.1 Overview 1-1 <br /> Nee 1.2 CEQA Final EIR Process 1-3 <br /> 1.3 Organization of the Document 1-4 <br /> 2. Comments on the Draft Environmental Impact Report 2-1 <br /> 2.1 List of Commenters 2-1 <br /> 2.2 Additional Correspondence 2-1 <br /> _ 2.3 Comments 2-2 <br /> 3. Response to Comments 3-1 <br /> 3.1 Summary 3-1 <br /> " 3.2 Response to Comments 3-1 <br /> 4. Minor Revisions to the Draft Environmental Impact Report 4-1 <br /> 3.6 Proposed Project Components 4-1 <br /> 4.4 Transportation and Circulation 4-13 <br /> 6.4 Significant Irreversible Environmental Changes That Would Result from <br /> ._ the Proposed Project Should it be Implemented 4-62 <br /> 5. Mitigation Monitoring and Reporting Program 5-1 <br /> 5.1 Requirement 5-1 <br /> .. 5.2 Mitigation and Monitoring Reporting Program 5-1 <br /> 6. Report Preparation 6-1 <br /> 7. References 7-1 <br /> Appendices <br /> A. Additional Air Quality Analysis A-1 <br /> B. Revised Traffic Impact Study B-1 <br /> C. SR 33/Welty Road Intersection Safety Analysis C-1 <br /> bee <br /> Cemex Vernalis Q..,,Mining and Reclamation Project ESA 1203015 <br /> P inal Environmental Impact Report June 2008 <br /> L <br />