Laserfiche WebLink
Table of Contents <br /> Page <br /> List of Figures <br /> 3-3 REVISED Mining Plan Option 1 4-3 <br /> 3-4 REVISED Mining Plan Option 2 4-5 <br /> 3-6 REVISED Reclamation Plan Option 1 4-7 <br /> 3-7 REVISED Reclamation Plan option 2 4-9 <br /> 4.4-1 Intersections and Section Location Map 4-14 — <br /> 4.4-2 Trip Distribution Percentages— Haul Route 1 4-16 <br /> 4.4-3a REVISED Haul Route 3 — Entering 4-17 <br /> 4.4-3b REVISED Haul Route 3 — Exiting 4-18 <br /> 6-1 REVISED Surrounding Proposed and Approved Projects 4-60 <br /> 6-2 REVISED Surrounding and Approved Projects in Vernalis 4-61 <br /> List of Tables <br /> 2-1 Persons and Agencies Commenting on the Draft EIR 2-1 <br /> 2-2 Additional Correspondence 2-2 <br /> 3-1 REVISED Proposed Project Features and Characteristics 4-11 <br /> 3-2 REVISED Proposed Project Mining and Reclamation Schedule 4-11 <br /> 4.4-1 Level of Service Characteristics for Unsignalized Intersections 4-20 <br /> 4.4-2 REVISED AM Peak Hour Intersection of Service Summary 4-23 <br /> 4.4-3 REVISED AM Peak hour Road Segment Level of Service Summary 4-25 <br /> 4.4-4 REVISED Project Trip Generation 4-28 <br /> 4.4-5 REVISED Traffic Index (20-Year) Summary 4-33 <br /> 4.5-5A REVISED Operational Emissions at a Production Level of 4 Million Tons 4-47 <br /> 4.6-513 REVISED Operational Emissions at a Production Level of 2.85 Tons 4-47 <br /> 4.6-5C REVISED Operational Emissions at a Production Level of 1.7 Million Tons 4-48 <br /> 4.6.6A REVISED Health Risk Assessment Results 4-49 <br /> 4.6.68 REVISED Health Risk Assessment Results by Source Category 4-50 <br /> 4.6.6C REVISED Health Risk Assessment Receptors 4-50 <br /> 5-1 Mitigation Monitoring and Reporting Program Cemex Vernalis Quarry Project 5-2 <br /> Cemex Vernalm Ouan,Mining and Reclamation Pri, c II ESA 1203015 <br /> Final Emironmental Impact Report June 2008 <br />