Laserfiche WebLink
r-; r r r r r r r I r . , r <br /> Executive Summary <br /> TABLE 2-1 (CONTINUED) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> Environmental Impact Mitigation Measures Level of Significance <br /> (Level of Significance Prior to Mitigation) After Mitigation <br /> 2. The Native American Heritage Commission was unable to <br /> identify a descendant or the descendant failed to make a <br /> recommendation within 24 hours after being notified by the <br /> commission. <br /> Hazards And Hazardous Materials <br /> 4.11.1 There is the potential for existing and/or previously 4.11.1 If contaminated soil and/or groundwater are encountered or Less than Significant <br /> unidentified contamination to be encountered during suspected contamination is encountered during site clearing, <br /> project site preparation,construction activities,and construction activities,and mining activities,work shall be halted in <br /> mining activities.A leaking underground storage tank site the area of concern.The Applicant shall determine the type and <br /> (Fallon Tank Company)was identified in the database extent of the contamination by consulting with the appropriate <br /> search as being located near the intersection of South regulatory agencies(RWQCB, DTSC,and/or the San Joaquin or <br /> Costa Ranch Road(formerly Koster Road)and Blewett Stanislaus County Health Department)and implementing any <br /> Road.The exact location could not be determined.The necessary measures,such as soil and/or groundwater sampling and <br /> agencies who would oversee this type of case were analysis. If required by the regulatory agencies,a remediation plan <br /> contacted.There are no records on file for this site with shall be implemented either in conjunction with or prior to continued <br /> the Department of Toxic Substances Control,the project construction and/or mining activities. <br /> Regional Water Quality Control Board,or the San <br /> Joaquin County Environmental Health Department. <br /> Encountering contaminated soil,surface water,and <br /> groundwater without taking proper precautions could <br /> result in the exposure of construction workers and <br /> consequently result in associated significant adverse <br /> human health and environmental impacts.This would be <br /> a potentially significant impact.(PS) <br /> 4.11.2 During excavation,grading,and construction activities of 4.11.2 The project applicant shall ensure that all contractors and employees Less than Significant <br /> the proposed facilities,it is anticipated that limited immediately control the source of any leak and immediately contain <br /> quantities of miscellaneous hazardous substances,such any spill utilizing appropriate spill containment and countermeasures. <br /> as gasoline,diesel fuel,hydraulic fluid,solvents,oils,etc. If required by any regulatory agency,contaminated media shall be <br /> would be brought onto the site. In addition,the proposed collected and disposed of at an offsite facility approved to accept such <br /> project operations will include the use of fuels and other media. In addition,all precautions required by the RWQCB issued <br /> hazardous materials.As with any liquid and solid,during NPDES construction activity storm water permits would be taken to <br /> handling and transfer from one container to another,the ensure that no hazardous materials enter any nearby waterways. <br /> potential for an accidental release exists.Depending on <br /> the relative hazard of the material,if a spill were to occur <br /> of significant quantity,the accidental release could pose <br /> both a hazard to construction employees as well as the <br /> environment.This would be a potentially significant <br /> impact. (PS) <br /> Cemex Vernahs Quarry Mining and RedamabOn Project ES-23 ESA /23015 <br /> Final Environmental mpad Report June 2008 <br />