Executive Summary <br /> TABLE ES-1 (CONTINUED) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> Environmental Impact Mitigation Measures Level of Significance <br /> (Level of Significance Prior to Mitigation) After Mitigation <br /> 4.11.3 The project would involve the installation and use of No mitigation is required. <br /> above-ground fuel storage tanks,and the storage and <br /> use of solid waste and hazardous materials.This would <br /> be a less-than-significant impact.(LS) <br /> 4.11.4 Exposure of the existing and future residents near the 4.11 A The sift ponds and the mining pits proposed as a part of the project Less than Significant <br /> project area to potentially high levels of nuisance and should be properly designed and maintained so that they do not <br /> disease vectoring mosquitoes from the addition of silt breed mosquitoes.The design and maintenance of the basins should <br /> ponds and mining pits that could contain storm water on be done in consultation with the San Joaquin County Mosquito <br /> the project site would be a significant health hazard. Abatement District and the East Side Mosquito Abatement District in <br /> Mosquitoes are vectors of diseases such as malaria, Stanislaus County. <br /> encephalitis,West Nile virus,and canine heartworm <br /> disease.This would be a potentially significant impact. <br /> (PS) <br /> 4.11.5 Records maintained at the San Joaquin County No mitigation is required. <br /> Agricultural Commissioner show that restricted pesticides <br /> have been permitted for use on the project site.Their <br /> records date back to the year 2000.However,other <br /> chemicals may have been used in the past,either for <br /> which the Department of Agriculture no longer has <br /> records or during the time when there were no <br /> restrictions on pesticide use.Topsoil would be mined and <br /> retained onsite.This would be a less-than-significant <br /> impact.(LS) <br /> 4.11.6 Exposure of individuals to asbestos containing dust and 4.11.6 No mitigation is required. <br /> lead-based paint.The existing structures on the project <br /> site that would be moved to another location on the site <br /> may have asbestos-containing materials(ACMs)and <br /> lead-based paint may have been used in the construction <br /> of those structures. Indiscriminate and unmitigated <br /> demolition of structures containing ACMs and lead-based <br /> paint could create asbestos dust,lead paint chips and <br /> lead dust that could travel offsite and present an <br /> inhalation hazard for both construction workers and the <br /> surrounding public. In addition,collection and disposal of <br /> ACMs and lead paint debris by untrained personnel could <br /> similarly result in asbestos and lead paint dust emissions <br /> offsite.This would be a less-than-significant impact.(LS) <br /> Cemex Vernalis Qua"Mining and Reclamation Project ES-24 ESA 110+015 <br /> Fines Environmental Impact Report Juno 2006 <br /> I _. L I l __ I . I _ l_ 1 L. _ _ L __ l__ 1 - L,_ 1 __ L . � �_ 1. _ L _ _ i _ <br />