Executive Summary <br /> TABLE ES-1 (CONTINUED) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> Environmental Impact Mitigation Measures Level of Significance <br /> (Level of Significance Prior to Mitigation) After Mitigation <br /> 6.5 Traffic noise levels resulting from the increase in traffic 6.5.1 Implement Mitigation Measure 4.5.3. Significant <br /> volumes associated with operation of the mine will be <br /> cumulatively considerable when considered along with <br /> past,present,and future projects in the project area, <br /> which will result in increased noise levels at residences <br /> located along truck haul routes. The cumulative impact <br /> would be significant. (S) <br /> 6.6 The slope instability hazards would remain specific to the No mitigation is required. <br /> proposed RMC project site and be localized with the <br /> active mining area and therefore would not contribute to a <br /> region-wide cumulative slope instability condition.This <br /> would be a less-than-significant impact.(LS) <br /> 6.7 With mitigation,the project would not contribute to 6.7.1 Implement Mitigation Measures 4.8.1 a,4.8.1b,4.8.2,and 4.8.3 to Less than significant <br /> cumulative, regional adverse impacts on the lower Tulare mitigate the project's incremental contribution to groundwater supply <br /> Formation aquifer. Cumulative impacts would be and quality impacts. <br /> potentially significant. (PS) <br /> 6.8 The project under Mining Option 2(mining out Hospital 6.8.1 Implement Mitigation Measure 4.8.6. Project: Less than <br /> Creek and constructing a berm to form a large detention significant <br /> basin)could contribute to the cumulative reduction of Mining Plan Option 2: <br /> Flows to the San Joaquin River. Cumulative impacts Significant <br /> would be significant.(S) <br /> 6.9 Cumulative impacts would be associated with increased 6.9.1 Implement Mitigation Measures 4.9.2a,4.9.21b,and 4.9.2c to mitigate Less than significant <br /> disturbance to potential special-status species due to the project's incremental contribution to biological resource impacts. <br /> increased noise, loss of agricultural land and potential <br /> habitat,increased traffic along roadways which could <br /> potentially increase mortality of wildlife.The project's <br /> contribution to cumulative impacts to biological resources <br /> is potentially significant.(PS) <br /> 6.10 The project's contribution to cumulative impacts to 6.10.1 Implement Mitigation Measures 4.10.1,and 4.10.2 to mitigate the Less than significant <br /> cultural resources is potentially significant. (PS) project's incremental contribution to cultural resource impacts. <br /> PS=Potentially significant;LS=Less than significant;S=Significant <br /> Cemex Vernalis Quarry Mining and Reclamation Propct ES-26 ESA 1213015 <br /> Final Emimnmantal Imp aReport 1 Juna 200.9 <br />