Laserfiche WebLink
1.Introduction <br /> 1 .2 CEQA Final EIR Process <br /> Prior to the release of the Draft EIR, San Joaquin County(Lead Agency) issued a Notice of <br /> 1. Preparation (NOP) for a 30-day comment period between December 23,2002 and January 23, <br /> 2003.The environmental issues raised during the scoping process were considered in the Draft <br /> EIR(see Appendix A of the Draft EIR). <br /> •. The Draft EIR for the RMC Pacific Vernalis Quarry Mining and Reclamation Project was <br /> submitted to the State Clearinghouse (SCH#2002122122) and released for public and agency <br /> review on May 22,2006. This public review and comment period concluded on July 6, 2006. <br /> L Eleven comment letters were received, and are included in this document(Chapter 2)along with <br /> responses to environmental issues raised in the comment letters. Additional correspondence <br /> received after the Draft EIR review period is included in Chapter 6 of this FEIR. <br /> As a result of comments received on the Draft EIR,two subsequent analyses were prepared. The <br /> first is a revised traffic analysis,prepared to respond to comments raised by the California <br /> r <br /> Department of Transportation(Caltrans), San Joaquin County Public Works,and LASER The <br /> second analysis was a revised air emissions analysis and health risk assessment using the HARP <br /> model.This analysis was done in response to comments received from the San Joaquin Valley <br /> Air Pollution Control District(SJVAPCD)and LASER. Both of these analyses are included as <br /> appendices to this Final EIR. <br /> Neither the traffic nor air quality analysis identified impacts that are different or substantially <br /> greater than those identified in the Draft EIR. Therefore these analyses do not constitute <br /> significant new information per CEQA Guidelines Section 15088.5 and recirculation of the Draft <br /> Yr EIR is not required. The new information clarifies and amplifies the impacts that were previously <br /> identified in the Draft EIR.As these analyses were prepared in response to comments received on <br /> the Draft EIR,and did not identify new or substantially greater impacts,the public would not be <br /> v. deprived of an opportunity to comment on a significant environmental effect. Minor <br /> _ modifications to the Draft EIR have been made and are included in this Final EIR. <br /> L <br /> The CEQA Guidelines (Section 15132) specify that the Final EIR shall consist of <br /> L (a) The Draft EIR or a revision of the draft. <br /> (b) Comments and recommendations received on the Draft EIR either verbatim or in <br /> summary. <br /> L (c) A list of persons,organizations, and public agencies commenting on the Draft EIR. <br /> (d) The responses of the lead agency to significant environmental points raised in the <br /> review and consultation process. <br /> L (e) Any other information added by the lead agency. <br /> Thus,the Final EIR will consist of this Final EIR document(June 2008)as well as the Draft EIR <br /> L documents (May 2006). The Planning Commission will certify the Final EIR at a public hearing <br /> and recommend to the Board of Supervisors whether to approve or deny the project. The Board of <br /> Supervisors will consider the recommendations of the Planning Commission, County staff,and <br /> public testimony and decide whether to approve or deny the project. <br /> i <br /> ` Cemex Vernalrs Quarry Mining and Reclamaton Project 1-3 ESA 1203015 <br /> — Final Environmental Impact Report June 20D8 <br /> ` <br />