My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cemex Vemalis Quarry Mining and Redamation Project <br /> 1 .3 Organization of the Document <br /> The Final EIR is organized into six chapters. Chapter I provides an overview of the CEQA <br /> process and the Final EIR. Chapter 2 provides the written and verbal comments on the Draft EIR <br /> received during the review period. Chapter 3 provides the Lead Agency's responses to the <br /> comments in Chapter 2. Chapter 4 includes corrections and additions to the Draft EIR text as a <br /> result of comments made on the Draft EIR. Chapter 5 includes the Mitigation and Monitoring <br /> Reporting Plan for the project. Chapter 6 contains correspondence regarding the project received <br /> after the Draft EIR was circulated for public comment. Chapters 7 and 8 contain a list of <br /> preparers of the Final EIR and any additional reference materials used in the preparation of the <br /> document, respectively. Appendices to the Final EIR include the revised air quality analysis and <br /> revised traffic analysis. <br /> Cemex Vermis Quarry Mining and Reclamation Pooled 1-4 ESA 1203015 <br /> Final Emironmental Impact Report June 2(108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.