EXECUTIVE SUMMARY(Continued) — <br /> Intersection of Koster Road and Blewett Road <br /> The analyses indicate that the intersection is currently operating at acceptable levels of service and is — <br /> expected to continue to operate at acceptable levels of service on opening-day of the proposed <br /> Project. The intersection will likely require widening to accommodate truck turning movements. <br /> The required widening is a Project-specific mitigation requirement. <br /> The intersection is expected to operate at a level of service D based on cumulative year 2025 <br /> conditions with the Project. It is not anticipated that traffic signal warrants will be satisfied at the <br /> intersection. All-way stop control is expected to mitigate the unacceptable levels of service in the <br /> future. <br /> Intersection of Welty Road and Blewett Road <br /> The analyses indicate that the intersection of Welty Road and Blewett Road is currently operating at <br /> acceptable levels of service and is expected to continue to operate at acceptable levels of service <br /> based on the near-term and cumulative conditions. No significant impacts are identified at this <br /> intersection. <br /> Intersection of SR 33 and Welty Road — <br /> The analyses indicate that the intersection of SR 33 and Welty Road is currently operating at <br /> acceptable levels of service and is expected to continue to operate at acceptable levels of service <br /> based on the near-term without-Project conditions. Haul Route 1 is not expected to create opening- <br /> day significant impacts. However, Haul Route 3 is expected to result in an opening-day impact that <br /> would require mitigation. <br /> The intersection is expected to operate at a level of service C in the year 2025 without the proposed — <br /> Project and Haul Route 1 will not create additional impacts in the year 2025. However, Haul Route <br /> 3 would exacerbate the cumulative year 2025 impacts to a level of service F. <br /> To mitigate the impacts created by Haul Route 3 on opening day the Project may be conditioned to <br /> operate at a maximum annual production of 1.9 million tons while Haul Route 3 is in operation. If <br /> the Project is limited to 1.9 million tons per year, the near-term with Project level of service will be <br /> C and no significant impacts will occur. To mitigate significant impacts in the cumulative <br /> conditions, the Project may be conditioned to eliminate Haul Route 3 after the pending construction <br /> of the Bird Road/SR 132 interchange,at which time only Haul Route I would be allowable. <br /> Interchange of Interstate 5 and State Route 132 <br /> The interchange is expected to operate at acceptable levels of service through the year 2025 with the — <br /> Project based on the projected traffic volumes. The only exception is that the SR 132 westbound <br /> merge from southbound I-5 may operate at a level of service D in the fixture with or without the <br /> proposed Project. This is not considered a Project-specific impact. _ <br /> Bird Road between Blewett Road and SR 132 <br /> Bird Road currently operates at acceptable levels of service and is expected to continue to operate at — <br /> acceptable levels of service with the Project through the year 2025. <br />