Laserfiche WebLink
B.2. Project Description <br /> The Cemex Vernalis Quarry Mining and Reclamation Project site includes approximately 688 <br /> acres of land that is situated east of Koster Road, South Costa Ranch Road, and the Delta- <br /> Mendota Canal, south of Blewett Road, and approximately two miles east-northeast of the <br /> Highway 580/Highway 5 interchange (refer to Draft EIR, Figure 3-1, Regional Location Map). <br /> Of the 688 acres, approximately 590 acres (86%) is located within San Joaquin County and the <br /> remaining approximately 98 acres is located in Stanislaus County. <br /> The mining operation, as proposed, would consist of sand and gravel extraction and the <br /> processing of construction aggregates on property owned and leased by the applicant. The <br /> application proposes active mining for 26 to 60 years and the reclamation of all disturbed land in <br /> phases, resulting in an ultimate end use of agricultural land and open space. <br /> The proposed mining operation would consist of the extraction of 1.7 to 4.0 million tons per <br /> year. The operation will be open pit, sand and gravel harvesting and processing. A mining plan <br /> was developed based on reviewing over 35 soil borings completed on the project site. Maximum <br /> mining depths will vary from 88 to 116 feet below ground surface, depending on the <br /> groundwater level. No mining will occur in the groundwater aquifer. In addition to the mining <br /> operation, the project would include a processing plant and office facilities. <br /> Land uses in the area of the Proposed Project are governed by the San Joaquin County General <br /> Plan,the Stanislaus County General Plan, and the San Joaquin County and Stanislaus County <br /> Zoning Ordinances. Under the Proposed Project,no changes in land use designations are <br /> proposed, and mining activities are allowed under both the San Joaquin County General <br /> Agriculture land use designation and the Stanislaus County Agriculture land use designation. <br /> (Draft EIR, p. 2-1.) <br /> C. ENVIRONMENTAL REVIEW & PUBLIC PARTICIPATION <br /> The County conducted an extensive environmental review for this project that included a Draft <br /> EIR, Final EIR, appendices and attachments, along with public scoping and review meetings and <br /> public comment period. The Final EIR consists of the Draft EIR in two volumes plus the Final <br /> EIR in volumes, which Final EIR contains comments and responses to comments on the <br /> Draft EIR, as well as revisions to the Draft EIR and appendices. <br /> The implementation of the EIR scoping and review process is described in Section 1.3 of the <br /> Draft EIR. The following is a summary of the County's environmental review for this project. <br /> • An EIR Notice of Preparation (NOP)was distributed to the State Clearinghouse, <br /> responsible agencies, interested groups and individuals, and surrounding property owners <br /> on December 23, 2002, for a 30-day comment period; <br /> • The Draft EIR was circulated for review from May 22, 2006 to July 5, 2006; <br /> • Copies of the Draft EIR were sent directly to responsible, trustee, and other State, <br /> Federal, and local agencies expected to have expertise or interest in the resources that <br /> may be affected by the Project; <br /> 2 <br />