Laserfiche WebLink
• Specific economic, legal, social, technological, or other considerations, including <br /> considerations for the provision of employment opportunities for highly trained workers, <br /> make infeasible the mitigation measures or project alternatives identified in the final EIR, <br /> but specific overriding economic, legal, social, technological, or other benefits of the <br /> project outweigh the significant effects on the environment. <br /> (Public Resources Code § 21081; CEQA Guidelines § 15091(a).) This County hereby finds that <br /> the followingpotential environmental impacts can and will be mitigated to below a level of <br /> significance, with implementation of the mitigation measures recommended in the EIR. <br /> D.2.1. Land Use <br /> Impact 4.2.1 <br /> The Proposed Project has the potential to conflict with existing and planned land uses <br /> surrounding the project site. (Draft EIR,p. 4.2-8.) <br /> Significance Before Mitigation: Potentially Significant. <br /> Facts: Operation of the project has the potential to result in incompatibilities related to air <br /> quality, noise,traffic and visual resources, which could impact adjacent land use absent <br /> mitigation. See Draft EIR, p. 4.2-8. <br /> Mitigation Measures: <br /> Mitigation Measure 4.2.1: Implement Mitigation Measures 4.4.1a and b; 4.4.2; 4.4.3; 4.4.4 <br /> (traffic mitigation); 4.5.1a,b, c and d; 4.5.2; 4.5.3 (noise mitigation); 4.6.1; 4.6.2; 4.6.4 (air <br /> quality mitigation); and 4.12.2 (visual resources mitigation). (Draft EIR,p. 4.2-8.) <br /> Findings: <br /> Based on the whole record, this Commission finds that with implementation of Mitigation <br /> Measure 4.2.1, impacts related to potential conflict with surrounding land uses are reduced to a <br /> less than significant level. (Draft EIR, p. 4.2-8.) <br /> Impact 4.2.3 <br /> The Proposed Project could conf ict with an applicable habitat conservation plan or natural <br /> community conservation plan. (Draft EIR, p. 4.2-11.) <br /> Significance Before Mitigation: Potentially Significant. <br /> Facts: The project has the potential to impact species covered by the San Joaquin County Multi- <br /> Species Habitat Conservation Plan (SJMSCP). See Draft EIR,p. 4.2-11. <br /> Mitigation Measure 4.2.3: Implement Mitigation Measures 4.9.2a—c (addressing impacts to <br /> covered species). As discussed in Section 4.9 of the Draft EIR, the applicant has the option to <br /> implement either the SJMSCP or equivalent mitigation measures. Either of these options would <br /> 10 <br />