Laserfiche WebLink
the quarry work will be performed below grade, landscape berms will help to reduce the visual <br /> impacts during mining activities, and the site will be reclaimed to agricultural land. No <br /> mitigation is required. (Draft EIR,pp. 4.12-12 to 4.12-13.) <br /> D.1.9. Cumulative Impacts <br /> Impact 6.1 <br /> Cumulative development would not be expected to result in an overall cumulative adverse land <br /> use impact since the County has designated mining as an acceptable use on agricultural land. <br /> This would be a less-than-significant impact. No mitigation is required. (Draft EIR„p. 6-8.) <br /> Impact 6.2 <br /> The project when combined with other large-scale mining operations in the area, would not add <br /> incrementally to the cumulative loss of agricultural production in the area because the site is <br /> being reclaimed to agriculture. This is a less-than-significant impact. No mitigation is required. <br /> (Draft EIR,pp. 6-8 to 6-9.) <br /> Impact 6.6 <br /> The slope instability hazards would remain specific to the proposed Cemex project site and be <br /> localized with the active mining area and therefore would not contribute to a region-wide <br /> cumulative slope instability condition. This would be a less-than-significant impact. No <br /> mitigation is required. (Draft EIR, pp. 6-9 to 6-10.) <br /> D.2. FINDINGS REGARDING IMPACTS ANALYZED IN THE EIR AND <br /> DETERMINED TO BE SIGNIFICANT BUT MITIGATED TO LESS <br /> THAN SIGNIFICANT <br /> This section includes findings for project impacts which are potentially significant,but which arc <br /> mitigated to a less than significant level with the imposition of mitigation measures. This <br /> Commission finds that all potentially significant impacts of this project listed below can and will <br /> be substantially lessened or avoided by imposition of mitigation measures. Specific findings of <br /> this Commission for each impact are set forth below in this section. <br /> No public agency shall approve or carry out a project for which an EIR has been certified which <br /> identifies one or more significant effects unless the public agency makes one or more of the <br /> following findings, supported by substantial evidence in the record: <br /> • Changes or alterations have been required in, or incorporated into, the project which <br /> avoid or substantially lessen the significant environmental effect as identified in the final <br /> EIR. <br /> • Such changes or alterations are within the responsibility and jurisdiction of another <br /> public agency and not the agency making the finding. Such changes have been adopted <br /> by such agency or can and should be adopted by such other agency. <br /> 9 <br />