My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Measure 4.3.4: The Reclamation Plan for the proposed project shall be modified to <br /> incorporate elements of a comprehensive soil resource extraction, maintenance and <br /> reintroduction plan. The ultimate goal of the plan will be to ensure the future productivity of the <br /> soil resource and its availability for future agricultural cultivation in compliance with the <br /> performance standards for prime agricultural land reclamation, Title 14 of the California Code of <br /> Regulations, Section 3707 and 371 l..At a minimum,the plan shall consist of the following <br /> elements: <br /> a. Existing Conditions. This element of the plan shall identify the existing soil <br /> fertility in terms of pertinent soil physical, chemical, and biological attributes. It will <br /> identify the soil attributes that are most able to be maintained during the 30-to 60-year <br /> life of the mining plan and will be used as the baseline, with which to compare the soil <br /> resource following reclamation and better enable rehabilitation of the mining site. <br /> b. Soil Harvesting and Transport. This element will identify appropriate soil <br /> harvesting and transport methods to limit the compaction of the soil resource, maintain <br /> the existing soil profile, and to the extent feasible during transport, ensure the viability of <br /> existing soil biota. <br /> C. Soil Stockpile Maintenance and Monitoring. This element of the plan will outline <br /> performance standards and monitoring procedures for the soil stockpiles over the 30- to <br /> 60-year life of the proposed mining plan. In general, this element will identify suitable <br /> vegetative species (e.g., legumes)to be planted on the soil stockpiles, monitoring <br /> protocols for any periodic analytical analysis determined necessary, and procedures for <br /> conducting periodic soil microbiology cultures. This element will also identify watering <br /> requirements for the stockpiles and protocols for pest and invasive species control. <br /> d. Reclamation Activities. Following the completion of mining activities, site <br /> reclamation shall consist of preparing the site for cultivated agriculture. Soil tests and <br /> climatic studies of the reclaimed sites shall be systematically performed to ensure that <br /> soil compatibility is suitable for a production level present prior to mining. An evaluation <br /> of deep ripping the pit floor prior to the reintroduction of topsoil should be conducted to <br /> determine if such procedures would help to alleviate anticipated drainage limitations. In <br /> addition, the applicant shall minimize application of nitrogen and phosphorus fertilizers <br /> due to the close proximity of(shallow) groundwater. A complete agronomic evaluation <br /> shall be conducted prior to plantings to establish rates of fertilizer and herbicide <br /> applications. (Draft EIR,pp. 4.3-12 to 4.3-13.) <br /> Findings: <br /> Based on the whole record, this Commission finds that with implementation of Mitigation <br /> Measure 4.3.4, impacts to agricultural productivity of the project site are reduced to a less than <br /> significant level. (Draft EIR,p. 4.3-13.) <br /> D.2.3. Traffic and Circulation <br /> Impact 4.4.1 <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.