Laserfiche WebLink
Mitigation Measure 4.3.4: The Reclamation Plan for the proposed project shall be modified to <br /> incorporate elements of a comprehensive soil resource extraction, maintenance and <br /> reintroduction plan. The ultimate goal of the plan will be to ensure the future productivity of the <br /> soil resource and its availability for future agricultural cultivation in compliance with the <br /> performance standards for prime agricultural land reclamation, Title 14 of the California Code of <br /> Regulations, Section 3707 and 371 l..At a minimum,the plan shall consist of the following <br /> elements: <br /> a. Existing Conditions. This element of the plan shall identify the existing soil <br /> fertility in terms of pertinent soil physical, chemical, and biological attributes. It will <br /> identify the soil attributes that are most able to be maintained during the 30-to 60-year <br /> life of the mining plan and will be used as the baseline, with which to compare the soil <br /> resource following reclamation and better enable rehabilitation of the mining site. <br /> b. Soil Harvesting and Transport. This element will identify appropriate soil <br /> harvesting and transport methods to limit the compaction of the soil resource, maintain <br /> the existing soil profile, and to the extent feasible during transport, ensure the viability of <br /> existing soil biota. <br /> C. Soil Stockpile Maintenance and Monitoring. This element of the plan will outline <br /> performance standards and monitoring procedures for the soil stockpiles over the 30- to <br /> 60-year life of the proposed mining plan. In general, this element will identify suitable <br /> vegetative species (e.g., legumes)to be planted on the soil stockpiles, monitoring <br /> protocols for any periodic analytical analysis determined necessary, and procedures for <br /> conducting periodic soil microbiology cultures. This element will also identify watering <br /> requirements for the stockpiles and protocols for pest and invasive species control. <br /> d. Reclamation Activities. Following the completion of mining activities, site <br /> reclamation shall consist of preparing the site for cultivated agriculture. Soil tests and <br /> climatic studies of the reclaimed sites shall be systematically performed to ensure that <br /> soil compatibility is suitable for a production level present prior to mining. An evaluation <br /> of deep ripping the pit floor prior to the reintroduction of topsoil should be conducted to <br /> determine if such procedures would help to alleviate anticipated drainage limitations. In <br /> addition, the applicant shall minimize application of nitrogen and phosphorus fertilizers <br /> due to the close proximity of(shallow) groundwater. A complete agronomic evaluation <br /> shall be conducted prior to plantings to establish rates of fertilizer and herbicide <br /> applications. (Draft EIR,pp. 4.3-12 to 4.3-13.) <br /> Findings: <br /> Based on the whole record, this Commission finds that with implementation of Mitigation <br /> Measure 4.3.4, impacts to agricultural productivity of the project site are reduced to a less than <br /> significant level. (Draft EIR,p. 4.3-13.) <br /> D.2.3. Traffic and Circulation <br /> Impact 4.4.1 <br /> 12 <br />