Laserfiche WebLink
Mitigation Measure 4.9.1: The project applicant shall ensure that any loss of waters of the U.S., <br /> ifift,, shall be compensated for by the preservation or creation of similar habitat at a ratio no <br /> less than 1:1,prior to mining that phase. This preservation and/or creation of wetlands may occur <br /> either on-site, at an off-site location, or at an ACOE approved mitigation bank. To ensure <br /> mitigation of habitat similar to that impacted by Mining Plan Option 2, if this mitigation occurs <br /> off-site and not at a mitigation bank,the mitigation shall be located on alluvial fans or terraces in <br /> either western-San Joaquin or Stanislaus Counties. Permits secured for the project may require <br /> higher ratios. (Draft EIR,p. 4.9-13 to 4.9-14.) <br /> Findings: <br /> Based on the whole record, this Commission finds that with implementation of Mitigation <br /> Measure 4.9.1, in the unlikely event that there are any, impacts to waters of the U.S., they would <br /> be reduced to a less than significant level. (Draft EIR,p. 4.9-14.) <br /> Impact 4.9.2 <br /> Project activities could result in adverse impacts to special status-species covered under the <br /> SJMSCP. (Draft EIR,p. 4.9-14.) <br /> Significance Before Mitigation: Potentially Significant. <br /> Facts: Special status species covered by the SJMSCP may be adversely affected by project <br /> activities. See Draft EIR, pp. 4.9-14 to 4.9-18. <br /> Mitigation Measures <br /> Mitigation Measure 4.9.2a: Conditions on the project site currently provide habitat for San <br /> Joaquin kit fox. Site conditions will change over the 26- to 60-year life of the project; therefore, <br /> the following mitigation measures shall be implemented prior to implementation of any Phase of <br /> mining. <br /> (1) Comply with the SJMSCP. For Phases complying with the SJMSCP, no further mitigation is <br /> required, or (at applicant's option) <br /> (II) For Project Phases not complying with the SJMSCP, the applicant shall perform an early <br /> evaluation of the Phase according to USFWS protocol for San Joaquin kit fox surveys in the <br /> northern range(USFWS, 1999a), as updated. This protocol includes consultation with USFWS. <br /> If the USFWS concludes that the Phase would not affect San Joaquin kit fox habitat,no further <br /> mitigation(i.e., measures III and IV below) would be required for the Phase. If the USFWS <br /> determines that the Phase may affect San Joaquin kit fox habitat, it may require the applicant to <br /> conduct protocol-level surveys for San Joaquin kit fox and to implement avoidance or <br /> minimization measures in addition to the mitigation required here. <br /> (III)For Project Phases not complying with the SJMSCP,the applicant shall conduct pre- <br /> construction surveys per Standardized Recommendations for the Protection of the San Joaquin <br /> Kt Fox Prior to or During Ground Disturbance (USFWS 1999b), as updated. Potential dens <br /> (including man-made structures) and known dens shall be protected by minimum buffers of 50 <br /> 22 <br />