My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Measure 4.9.2b: The project shall avoid causing the failure of nesting tricolored <br /> colonies. The following mitigation measures shall be implemented prior to implementation of <br /> any Phase of mining. <br /> (I) Comply with the SJMSCP for eligible Phases occurring within San Joaquin County. For <br /> Phases complying with the SJMSCP, no further mitigation is required; or(at applicant's option), <br /> (II)Project Phases not complying with the SJMSCP, silt ponds, detention basins, or other bodies <br /> of water created by the project within 250 feet of the Phase shall be surveyed for breeding <br /> tricolored blackbirds; this survey shall occur between March 15 and June 15. Any active colonies <br /> shall be protected from operations activities by a 250-foot buffer. <br /> (II1) If silage crops are grown on project land prior to being mined or when reclaimed, these <br /> crops shall be surveyed by a biologist prior to harvesting. If tricolored blackbirds are nesting in <br /> the silage, the entire field shall not be harvested until the colony is no longer active. (Draft EIR, <br /> p. 4.9-17.) <br /> Mitigation Measure 4.9.2c: Conditions in the Proposed Project area currently provide breeding <br /> habitat for Swainson's hawk and white-tailed kite. Site conditions will change over the 26-to 60- <br /> year life of the project, therefore, the following mitigation measures shall be implemented prior <br /> to implementation of any Phase of mining. For any Phase where ground disturbing activities <br /> would commence during the raptor breeding season (March 15 through August 31), the applicant <br /> shall: <br /> (I) Comply with the SJMSCP. For Phases complying with the SJMSCP, no further mitigation is <br /> required, or (at applicant's option), <br /> (II) For Project Phases not complying with the SJMSCP, the applicant shall conduct pre- <br /> construction surveys for nesting raptors in suitable habitat within one-half mile (for Swainson's <br /> hawk) and 500 feet (for whitetailed kite) of the Phase boundaries. Surveys shall begin either at <br /> the beginning of the breeding season, or four weeks prior to beginning mining activities in the <br /> Phase,whichever is later. If nesting raptors are recorded within these buffers, the applicant shall <br /> not permit construction activities within these buffers except in consultation with CDFG. (Draft <br /> EIR,p. 4.9-17.) <br /> Mitigation Measure 4.9.2d: Conditions at the project site currently provide low suitability <br /> habitat for burrowing owls. Site conditions will change over the 26-to 60-year life of the project; <br /> therefore the following mitigation measures shall be implemented prior to implementation of any <br /> Phase of mining: <br /> (I) Comply with the SJMSCP. For Phases complying with the SJMSCP, no further mitigation is <br /> required, or(at applicant's option) <br /> (II) For Project Phases not covered under the SJMSCP, a habitat assessment for burrowing owls <br /> shall be conducted in the year prior to implementation of each Phase. Burrowing owl site <br /> assessments are generally only valid for one year. The site assessment for burrowing owls shall <br /> be conducted by a qualified biologist according to the CDFG Staff Report on Burrowing Owl <br /> Mitigation(CDFG, 1995), as updated. If warranted by the site assessment protocol (CDFG, <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.