1995), as updated, pre-construction surveys for burrowing owls shall be conducted in suitable <br /> habitat within 500 feet of each Phase's boundaries. These surveys require two site visits, once in <br /> December to January, and once April 15 to July 15. <br /> (III) If occupied burrows are recorded within a 500-foot buffer from the Phase, the project shall <br /> avoid mining operations within a 160-foot buffer of active burrows from September 1 to January <br /> 31, and within a 250-foot buffer from February I to August 31. If avoidance is not possible, then <br /> measures may also include (in consultation with CDFG)passive relocation and destruction of <br /> occupied burrows during the non-breeding season (October—January). To mitigate for the loss of <br /> any burrows, the applicant shall enhance and/or create burrows at a 2:1 ratio at a protected site in <br /> San Joaquin or Stanislaus Counties. The protected site shall include 6.5 acres of foraging habitat <br /> per occupied burrow lost contiguous with occupied burrow sites to compensate for the loss of <br /> each pair of breeding owls,or single, unpaired resident owl. (Draft EIR,pp. 4.9-17 to 4.9-18.) <br /> Findings: <br /> Based on the whole record, this Commission finds that with implementation of Mitigation <br /> Measures 4.9.2a-4.9.2d, impacts to special status-species covered under the STMSCP are <br /> reduced to a less than significant level. (Draft EIR,p. 4.9-18.) <br /> D.2.9. Cultural Resources <br /> Impact 4.10.1 <br /> Damage to previously unidentified buried archaeological remains during project construction. <br /> (Draft EIR, p. 4.10-5.) <br /> Significance Before Mitigation: Potentially Significant. <br /> Facts: Unidentified buried archaeological remains could be damaged during excavation, grading, <br /> trenching, and other construction-related activities. See Draft EIR, pp. 4.10-5 to 4.10-6. <br /> Mitigation Measures <br /> Mitigation Measure 4.10.1: Stop work if cultural resources are discovered during project <br /> construction. If potentially significant cultural resources are discovered during ground-disturbing <br /> activities associated with project preparation, construction, or completion,work shall halt in that <br /> area until a qualified archaeologist can access the significance of the find, and, if necessary, <br /> develop appropriate treatment measures in consultation with San Joaquin and/or Stanislaus <br /> Counties and other appropriate agencies and individuals. (Draft EIR, pp. 4.9-15 to 4.9-17.) <br /> Findings: <br /> Based on the whole record, this Commission finds that with implementation of Mitigation <br /> Measure 4.10.1, impacts related to previously unidentified buried archaeological remains are <br /> reduced to a less than significant level. <br /> Impact 4.10.2 <br /> 25 <br />