Laserfiche WebLink
mitigation measures (See Section D.3 of these findings), the County concludes that these <br /> cumulative impacts would remain significant even after mitigation has been incorporated when <br /> combined with other related projects. Therefore, these impacts are overridden by the project <br /> benefits (Section F below) as discussed in the Statement of Overriding Considerations (Section G <br /> below). <br /> D.4.2. Growth Inducing Impacts <br /> CEQA §21100(b)(5) specifies that growth inducing impacts of a proposed project must be <br /> addressed in an EIR. State CEQA Guidelines §15126.2(d)provides direction to the scope of the <br /> analysis. As stated therein, an EIR must"discuss the ways in which a proposed project could <br /> foster economic or population growth, or the construction of additional housing, either directly <br /> or indirectly, in the surrounding environment." This discussion must include projects that would <br /> remove obstacles to population growth. <br /> The availability of sand and gravel aggregate resources does not, in itself, induce or encourage <br /> growth. The development of new sources of aggregate is typically considered a response to <br /> growth, not something that induces growth. Urban growth in San Joaquin County and Stanislaus <br /> County is controlled by their respective General Plans and is based on long-term land use <br /> allocations and the availability of a variety of factors. (Draft EIR,p. 6-2.) <br /> The San Joaquin County General Plan identifies the County as a leading agricultural producer, <br /> although it is noted that it is undergoing a transformation to more of an industrial and service <br /> economy. San Joaquin County's Census 2000 population of 563,598. Based on State of <br /> California Department of Finance projections,total population is projected to be approximately <br /> 727,800 by 2010 and approximately 887,600 by 2020. If the County is to sustain this growth and <br /> achieve a more diversified economic base, the county must ensure improvements to the County's <br /> infrastructure. <br /> The development of the project site for mining purposes would not be expected to induce <br /> substantial new population growth in the area; rather, it would serve to provide for the needed <br /> infrastructure of the County. (Draft EIR,p. 6-2.) <br /> E. ALTERNATIVES TO THE PROJECT <br /> State CEQA Guidelines §15126.6(a) requires an evaluation of"a range of reasonable alternatives <br /> to the project, or to the location of the project, which would feasibly attain most of the basic <br /> objectives of the project but would avoid or substantially lessen any of the significant effects of <br /> the project, and evaluate the comparative merits of the alternatives." The objectives of the <br /> proposed mine expansion project are identified in Section 3.4 in Chapter 3, Project Description, <br /> of the Draft EIR, and in Section B.1 of these Findings. Alternatives are used to determine <br /> whether or not a variation of the proposed project would reduce or eliminate significant project <br /> impacts within the basic framework of the objectives. State CEQA Guidelines §15126.6(c) <br /> discusses the range of alternatives to be evaluated, requiring that"[t]he EIR should briefly <br /> describe the rationale for selecting the alternatives to be discussed. ...Among the factors that <br /> may be used to eliminate alternatives from detailed consideration in the EIR are: (I) failure to <br /> meet most of the basic project objectives, (ii) infeasibility, or(iii) inability to avoid significant <br /> 39 <br />