My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the intersection of Blewett Road and Koster Road would be reduced since the trucks would enter <br /> and leave the site from Blewett Road and not be stopping or making turns at the intersection. <br /> Noise and air quality would remain the same because the number of truck trips per day would <br /> not change. However, the visual impacts would be increased as the structures and equipment <br /> associated with the plant site would be more visible for those traveling along Blewett Road. hi <br /> addition, the plant site would be situated in closer proximity to residences R-4 and R-5, located <br /> adjacent to the east side of the project site, along Blewett Road. All other impacts would remain <br /> the same as those of the proposed project. (Draft EIR, p. 5-3.) <br /> If the plant site were to be moved to the east side of the project site, in the Phase VI or VII areas, <br /> this would put the plant site further from Blewett Road and the residences located along Blewett <br /> Road (R-4 through R-8). Visual impacts would be reduced for those living and traveling along <br /> Blewett Road. However, an access road from Blewett Road back to that portion of the project <br /> site would have to be constructed. This would create additional temporary construction impacts, <br /> including dust and noise. The location of this access road would put the entrance and exit to the <br /> project site to the east of several residences located on Blewett Road, east of Koster Road (R-4 <br /> through R-8). This would increase truck traffic along Blewett Road and past several additional <br /> sensitive receptors that would not be affected with the proposed project. All other impacts would <br /> remain the same as those of the proposed project. (Draft EIR,p. 5-3.) <br /> If the plant site were to be moved further south along Koster Road into Phase II or III, there <br /> would be an increased buffer of land between the plant site and Blewett Road and the visual <br /> impacts would be reduced for those living and traveling along Blewett Road. However, since <br /> Koster Road crosses over the Delta-Mendota Canal before these phases, the existing dirt road on <br /> the east side of the canal would need to be improved for truck traffic. This would create <br /> additional temporary construction impacts, including dust and noise. hi addition, this location <br /> would put the plant site closer to a residence located on the west side of the Delta-Mendota <br /> Canal, potentially increasing the visual and noise impacts to that sensitive receptor. All other <br /> impacts would remain the same as those of the proposed project. (Draft EIR,p. 5-3; Final EIR, p. <br /> 4-1 (discussion of revised project phasing).) <br /> This alternative processing plant location was considered during the scoping process but was <br /> eliminated from further consideration. Although this alternative may have reduced some of the <br /> impacts as compared to the proposed Project, other impacts would have been greater. (Draft EK <br /> p. 5-2.) <br /> E.1.2. Extraction of Aimegate Below the Groundwater Level <br /> Another alternative to the proposed project which was considered early in the process but <br /> eliminated from further consideration was deep pit mining below the groundwater level. It is <br /> suspected that additional high quality aggregate material exists below the existing groundwater <br /> level and could be extracted with dewatering techniques or a` vet"mining operation. The option <br /> has the potential to reduce the extent of the footprint of the mine. (Draft EIR, pp. 5-3 to 5-4.) <br /> The San Joaquin County Title, Section 9-1415.3(u)requires an impact evaluation for quarry <br /> excavations below the groundwater level of the uppermost aquifer. Should additional resources <br /> exist below the groundwater level, the extraction of them may be a more environmentally <br /> 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.