Laserfiche WebLink
Alternative 3—Offsite Alternative–The Offsite Alternative considered an off-site alternative in <br /> the Tracy area. (Draft EIR,pp. 5-14 to 5-15.) A second off-site alternative in the Laguna <br /> Formation was considered but rejected as infeasible due to the age and volcanic clasts in the <br /> matrix of the material at the alternative site, and the high clay content, all of which would result <br /> in higher processing costs and mining and processing difficulties. (Draft EM pp. 5-20 to 5-21.) <br /> E.3. lendings Regarding Alternatives Considered in the EIR <br /> E.3.1. No Project Alternative <br /> Description <br /> The No Project Alternative is defined as the continuation of the existing condition(baseline) and <br /> trends in the project area. This alternative would involve no action on the part of San Joaquin <br /> County, Stanislaus County, or the Applicant for development of the project. Under this <br /> alternative, the proposed mining and processing would not occur, and the project site would <br /> remain as agricultural land and rural residential in its existing condition, as described in Chapter <br /> 3,Project Description, and in the setting sections of Chapter 4 of the Draft EIR. No discretionary <br /> approval would be required under this alternative. (Draft EIR, p. 5-6.) <br /> Basis for Selection <br /> The No Project Alternative is included in the EIR because the CEQA Guidelines, Section <br /> 15126.6(e)(1), require that an EIR evaluate a"no project' alternative along with its impact in <br /> order to provide a comparison of the impacts of approving the proposed project with the impacts <br /> of not approving the proposed project. Pursuant to CEQA Guidelines, Section 15126.6(e)(3)(B), <br /> the No Project Alternative discusses "the property remaining in its existing state."(Draft EIR, <br /> pp. 5-6 to 5-7.) <br /> Distinctive Environmental Characteristics <br /> The following summarizes potential impacts of the "No Project' alternative and compares them <br /> to the impacts of the proposed project: <br /> Land Use <br /> Under the No Project Alternative existing land use within the project area would remain <br /> unchanged and continue to be farmed in orchards and field crops. Hospital Creek would not be <br /> disturbed under the No Project Alternative. Any potential for conflicts with land use policies <br /> and/or adjacent land uses would not occur. (Draft EIR,p. 5-7.) <br /> Agricultural Resources <br /> Under the No Project Alternative existing land use within the project area would remain <br /> unchanged and continue to be farmed in orchards and field crops. There would be no short-term <br /> change in agricultural productivity due to impacts to soils under this alternative. The potential for <br /> agricultural resource impacts under the No Project Alternative would be less than those <br /> associated with the project. (Draft EIR, p. 5-7.) <br /> 44 <br />