My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
With a deeper excavation below the groundwater level, the mining pits would be filled with <br /> water and the ability to reclaim the mined areas as agricultural land would be eliminated. This <br /> would result in a greater loss of productive agricultural land than the project. (Draft EIR, p. 5-5.) <br /> Due to the potentially significant environmental impacts to groundwater hydrology, exceeding <br /> those associated with the proposed project, as well as the inability to reclaim the mined areas as <br /> agricultural land, this alternative was not evaluated as a viable alternative. (Draft EIR,p. 5-5.) <br /> E.1.3. Processing Material Extracted at the Project Site at the Existing Cemex <br /> Tracy Facility <br /> This alternative would have assessed the potential of extracting aggregate at the project site and <br /> then transporting the raw or semi-processed material to the existing and/or new plant located at <br /> the Applicant's Tracy Facility. (Draft EIR, p. 5-5.) <br /> The Applicant stated in their updated application (December 2003)that the proposed project is a <br /> replacement facility for their Tracy Plant. The Tracy Facility will be depleted of reserves in three <br /> to ten years. According to the Division of Mines and Geology, 82 percent of the material <br /> produced in the TracyNernalis area satisfies market demand to the north in the Stockton area. <br /> This alternative was considered during the scoping process to determine whether utilizing an <br /> existing facility closer to the market, potentially reducing traffic,noise, air quality, and visual <br /> impacts at the project site may be a more environmentally sensitive alternative. (Draft EIR,p. 5- <br /> 6.) <br /> The material extracted at the project site would be taken to an existing facility that is already <br /> processing material. The visual impacts would be reduced to residents near the project site and <br /> those traveling along Blewett and Koster Road. The construction and operations emissions <br /> would be reduced by not having a processing facility at the project site. The noise impacts from <br /> processing materials at the site would be eliminated with this alternative. (Draft EIR,p. 5-6.) <br /> However, there would still be truck traffic in the Vernalis area due to the trucks taking the <br /> extracted material to the existing Tracy Facility. Haul truck traffic would be increased because <br /> the trucks would then need to make additional trips when traveling to the Tracy Facility to pick <br /> up and deliver the material after it has been processed. (Draft EIR,p. 5-6.) This alternative was <br /> rejected because it would be inefficient and increase truck traffic. <br /> E.2. Alternatives Evaluated in Detail in the EIR <br /> Three alternatives were evaluated in detail in the EIR as alternatives to the proposed project and <br /> include: <br /> Alternative 1—No Project Alternative–Under the No Project Alternative, the project site would <br /> remain as agricultural land and rural residential in its existing condition. (Draft EIR, p. 5-6.) <br /> Alternative 2—Reduced Project Production–The Reduced Project Production Alternative <br /> considered two scenarios: Scenario 1 would reduce the rate of extraction to 1.7 to 2.85 (instead <br /> of 4.0)million tons per year. Scenario 2 would eliminate mining in Phases IV and V (Draft EIR, <br /> p. 5-9; Final EIR, p. 4-1 (discussion of revised phasing).) <br /> 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.