Laserfiche WebLink
c. A video tape of the planned haul routes showing conditions of all San Joaquin County roads shall be <br /> submitted to Public Works. The condition of County maintained roads along the haul route shall be <br /> reviewed by Public Works prior to the start of excavation. (Development Title Section 9-1415.2) <br /> d. Loads on all public roads shall be limited to legal loads only. (Vehicle Code Section 35551) <br /> e. An encroachment permit shall be required for work within public road rights-of-way. (Development <br /> Title Sections 9-1145.4 and 9-1145.5) <br /> f. The applicant shall pay a fair share of the funding for the improvements to the State Route 132/Bird <br /> Road interchange project and improvements connected with the interchange construction. Fair <br /> share means the fair share of 100 percent of the project cost shared solely between the Vernalis <br /> area aggregate operators and excluding existing traffic. <br /> g. Financing for the future State Route 132/Bird Road interchange shall be completed prior to any <br /> material leaving the properties under this permit. Financing shall be considered complete after a <br /> Mello-Roos District is formed and the sale of all bonds necessary to complete the construction of the <br /> interchange is conducted. Work that is preliminary to mining such as landscaping, stripping <br /> overburden, construction of berms, other site preparation, and installation of a conveyor system will <br /> be permitted to proceed prior to the interchange financing being complete. <br /> h. Once the financing for the State Route 132/Bird Road interchange is completed, the mined product <br /> traffic shall be restricted to the Alternate 3 haul route(revised as follows: Koster Road to Blewett <br /> Road to Welty Road to State Route 33 to Interstate 5). Any future reference to Alternate 3 haul route <br /> shall mean the revised version per above. Tonnage for this permit shall be restricted to 1.08 million <br /> tons per year on this alternate route. <br /> i. Once the future SR 132/Bird Road interchange is complete and open to traffic, the mined product <br /> traffic shall be restricted to Alternate 1 haul route(Koster Road to Blewett Road to Bird Road to State <br /> Route 132). Tonnage for this permit will not be restricted on this route. <br /> j. The haul routes shall be approved by Public Works from the project site. The portion of Koster Road <br /> north of Blewett Road shall not be considered as the haul route for the project. An engineering study <br /> of County roadways used as haul routes shall be required. The engineering study shall determine <br /> the adequacy of roadway width requirements, structural section, R-value, traffic index, overall safety, <br /> and shoulder requirements. The study shall be based on cumulative traffic generation of existing and <br /> future mining operations in the Vernalis area. The report shall also recommend improvements <br /> required to County roads to mitigate the increased truck traffic to comply with the County level of <br /> service standards on roadways and intersections. The applicant shall also be required to do all <br /> mitigations required by the engineering study and all mitigations as required by Public Works, <br /> Stanislaus County, and Caltrans. The report shall specifically study enhancements needed to <br /> accommodate truck turning movements using truck turn templates at the intersection of Koster Road <br /> and Blewett Road for Alternate 1 and Alternate 3 routes. The report shall also specifically study <br /> enhancements needed to address safety concerns for the Alternate 3 route, including the <br /> intersection of Welty Road and SR 33 related to sight lines, turning radii, and queuing at the railroad <br /> track. To the extent feasible as determined by San Joaquin County, Stanislaus County, and <br /> Caltrans, this intersection shall make the following improvements: <br /> (1) Construct 4-foot shoulders beyond the outermost truck wheel tracks. <br /> (2) Reconfigure intersection striping to prevent turning trucks from crossing over double yellow <br /> stripes.. <br /> Conditions of Approval - 13 - QX-01-0002 <br />