My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br /> E-2 Wetland Delineation Report — <br /> E-3 Burrowing Owl Habitat Assessment and Burrow Survey <br /> E-4 San Joaquin Kit Fox, California Red-Legged Frog and Swainson's Hawk Habitat <br /> Assessment <br /> E-5 Special-Status Species Plant Survey — <br /> F Native American Correspondence <br /> LIST OF FIGURES — <br /> 3-1 Regional Location Map.......................................................................................3-3 <br /> 3-2 Site Map with Parcel Numbers...........................................................................3-5 <br /> 3-3 Mining Plan Option 1 ..........................................................................................3-9 — <br /> 3-4 Mining Plan Option 2........................................................................................3-11 <br /> 3-5 Plant Site Plan View.........................................................................................3-16 <br /> 3-6 Reclamation Plan Option 1...............................................................................3-27 <br /> 3-7 Reclamation Plan Option 2...............................................................................3-29 <br /> 4.3-1 FMMP Classifications......................................................................................4.3-3 <br /> 4.3-2 Land Capability Classifications........................................................................4.3-5 <br /> 4.4-1 Intersection and Section Location Map...........................................................4.4-2 — <br /> 4.4-2 Trip Distribution Percentages—Haul Route 1.................................................4.4-4 <br /> 4.4-3 Trip Distribution Percentages—Haul Route 2.................................................4.5-5 <br /> 4.5-1 Effects of Noise on People..............................................................................4.5-2 <br /> 4.5-2 Long-Term Noise Measurements and Noise-Sensitive Receptors.................4.5-6 — <br /> 4.5-3 Noise Contours for the Portable Temporary Processing Plant, Mining <br /> Operations, and Haul Trucks.........................................................................4.5-13 <br /> 4.5-4 Noise Contours for the Permanent Processing Plant, Mining Operations, — <br /> andHaul Trucks ............................................................................................4.5-14 <br /> 4.7-1 General Map of Active and Potentially Active Faults in the Vicinity of the <br /> ProposedProject Site......................................................................................4.7-7 <br /> 4.8-1 Surface Waters................................................................................................4.8-3 — <br /> 4.8-2 Generalized Geologic Cross-Section—Westside San Joaquin Valley...........4.8-6 <br /> 4.8-3 DWR Groundwater Monitoring Well Locations................................................4.8-8 <br /> 4.8.4 Historic Water Levels for Well 4S/6E-05A001...............................................4.8-10 _ <br /> 4.8-5 Historic Water Levels for Well 4S/6E-04N001 ..............................................4.8-11 <br /> 4.8-6 Historic Water Levels for Well 4S/6E-04H001 ..............................................4.8-12 <br /> 4.12-1 Officially Designated State Scenic Highways................................................4.12-2 <br /> 4.12-2 Key Viewpoint A ............................................................................................4.12-5 — <br /> 4.12-3 Key Viewpoint B ............................................................................................4.12-6 <br /> 4.12-4 Key Viewpoint C............................................................................................4.12-7 <br /> 5-1 Off-Site Alternative...........................................................................................5-16 _ <br /> 6-1 Surrounding Proposed and Approved Projects..................................................6-6 <br /> 6-2 Surrounding and Approved Projects in Vernalis................................................6-7 <br /> LIST OF TABLES — <br /> 2-1 Summary of Impacts and Mitigation Measures..................................................2-5 <br /> 3-1 Proposed Project Features and Characteristics ..............................................3-19 <br /> 3-2 Proposed Project Mining and Reclamation Schedule......................................3-19 — <br /> 4.3-1 Important Farmland Acreage Summary..........................................................4.3-2 <br /> 4.3-2 Summary of Williamson Act Contracts............................................................4.3-6 <br /> 4.3-3 Farmland Conversion from 1998 to 2000 in Stanislaus and San Joaquin _ <br /> Counties ..........................................................................................................4.3-9 <br /> 4.4-1 Level of Service Characteristics for Unsignalized Intersections.....................4.4-7 <br /> 4.4-2 AM Peak Hour Intersection Level of Service Summary..................................4.4-8 <br /> 4.4-3 AM Peak Hour Road Segment Level of Service Summary.............................4.4-9 — <br /> 4.44 Project Trip Generation .................................................................................4.4-12 <br /> RMC Pacific Vemalls,Quant'Mining and Reclamation Project Iv ESA 1203015 <br /> Revised Administrative Draft Environmental Impact Report May 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.