Laserfiche WebLink
Table of Contents <br /> r <br /> 4.4-5 Traffic Index (20-Year) Summary..................................................................4.4-19 <br /> 4.5-1 Maximum Allowable Noise Exposure..............................................................4.5-8 <br /> 4.5-2 Long-Term Noise Monitoring Data................................................................4.5-10 <br /> 4.5-3 Typical Construction Activity Noise Levels....................................................4.5-12 <br /> 4.5-4 Typical Construction Equipment Noise Levels..............................................4.5-12 <br /> 4.5-5 Existing and Projected Morning Peak-Hour Traffic Noise Levels Along <br /> LocalRoadways............................................................................................4.5-20 <br /> 4.6-1 State and National Criteria Air Pollutant Standards, Effects, and Sources.....4.6-5 <br /> 4.6-2 San Joaquin Valley Attainment Status............................................................4.6-7 <br /> 4.6-3 Air Quality Data Summary(1999-2003)for the Project Area.......................4.6-14 <br /> 4.6-4 Construction Engine Emissions Estimates (Tons Per Year).........................4.6-21 <br /> 4.6-5A Operational Emissions at a Production Level of 4 Million Tons....................4.6-23 <br /> r 4.6-5B Operational Emissions at a Production Level of 2.85 Million Tons...............4.6-24 <br /> 4.6-5C Operational Emissions at a Production Level of 1.7 Million Tons.................4.6-24 <br /> 4.6-6 Operational DPM Emissions .........................................................................4.6-27 <br /> 4.7-1 Soils Within Proposed RMC Pacific Vernalis Quarry Project Site...................4.7-3 <br /> 4.7-2 Modified Mercalli Intensity Scale (Abridged)...................................................4.7-5 <br /> 4.7-3 Active and Potentially Active Regional Faults in the Vicinity of the <br /> Proposed RMC Pacific Vernalis Quarry..........................................................4.7-6 <br /> 4.8-1 Hydrologic Characteristics of Adjacent And Contributing Watersheds to <br /> theProject Site................................................................................................4.8-2 <br /> 4.8-2 Groundwater Wells in the Project Vicinity Included in the DWR Database ....4.8-9 <br /> 4.8-3 Definitions of Beneficial Uses of Surface Waters for the Project Area .........4.8-16 <br /> 4.9.1 Special-Status Species ...................................................................................4.9-6 <br /> 5-1 Comparison Matrix of the Project Alternatives.................................................5-22 <br /> 6-1 Surrounding Proposed and Approved Projects..................................................6-4 <br /> r <br /> Ir <br /> W <br /> r <br /> it <br /> r <br /> RMC Pacific Vemalis Qua"Mining and Reclamation Project v ESA/203015 <br /> Revised!Administrative Draft Environmental Impact Report May 2006 <br />