Laserfiche WebLink
2.4 Alternatives to the Proposed Project <br /> 2.3.3 Recreation <br /> The Proposed Project does not require,propose, or impact recreational facilities. <br /> 2.3.4 Utilities and Service Systems <br /> The Proposed Project will connect to an existing power grid at the intersection of Koster and <br /> Blewett Roads.Electrical service will be underground on the site and a transformer will be <br /> located next to the aggregate processing facility. Fuel for the asphalt plant will be provided by <br /> existing natural gas service.The Project would also utilize diesel fuel and gasoline for vehicle <br /> fuel and back-up power generation. There would be two 10,000-gallon aboveground diesel fuel <br /> tanks, and one 3,000-gallon aboveground gasoline tank. <br /> r <br /> The Proposed Project does not propose to connect to a wastewater system and will use on-site <br /> septic systems.Water for the Proposed Project will be supplied by water from on-site wells. <br /> Groundwater and surface water impacts are discussed in the Hydrology section of the EIR. The <br /> Proposed Project is not expected to generate significant quantities of solid waste. Solid waste will <br /> be collected in standard waste containers and will be picked up on a regular schedule by a local <br /> garbage service. Silt waste products from the plant will be discharged into silt ponds. All runoff <br /> from disturbed surfaces will either be directed to silt ponds or contained within the mining <br /> excavations. <br /> 2.4 Alternatives to the Proposed Project <br /> The purpose of the alternatives analysis in an EIR is to describe a range of reasonable alternatives <br /> to the Proposed Project that could feasibly attain its objectives and to evaluate the comparative <br /> r_ merits of the alternatives (CEQA Guidelines, Section 15126.6[a]). <br /> Additionally, Section 15126.6(b)of the CEQA Guidelines requires consideration of alternatives <br /> ` that could avoid or substantially lessen any significant adverse environmental effects of the <br /> Proposed Project, including alternatives that may be more costly or could otherwise impede the <br /> project objectives. The range of alternatives considered must include those that offer substantial <br /> environmental advantages over the Proposed Project and may be feasibly accomplished in a <br /> successful manner considering economic,environmental, social,technological,and legal factors. <br /> r <br /> The CEQA Guidelines recommend that an EIR should briefly describe the rationale for selecting <br /> the alternative to be discussed, identify any alternatives that were considered by the lead agency <br /> but were rejected as infeasible,and briefly explain the reasons underlying the lead agency's <br /> determination (CEQA Guidelines, Section 15126.6[c]). <br /> The following alternatives are discussed in detail in Chapter 5, Alternatives to the Proposed <br /> Project: <br /> • Alternative I —No Project Alternative <br /> �. RMC Pacific Vernalis Quarry Mining and Reclamation Project 2-3 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br />