Laserfiche WebLink
r r F r r r r r r r r r r r r r r r r <br /> 2.Executive Summary <br /> TABLE 2-1 (CONTINUED) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> Environmental Impact Mitigation Measures Level of Significance <br /> (Level of Significance Prior to Mitigation) After Mitigation <br /> d. Reclamation Activities. Following the completion of <br /> mining activities,site reclamation shall consist of <br /> preparing the site for cultivated agriculture.Soil tests <br /> and climatic studies of the reclaimed sites shall be <br /> systematically performed to ensure that soil <br /> compatibility is suitable for a production level present <br /> prior to mining.An evaluation of deep ripping the pit <br /> floor prior to the reintroduction of topsoil should be <br /> conducted to determine if such procedures would help <br /> to alleviate anticipated drainage limitations.In <br /> addition,the applicant shall minimize application of <br /> nitrogen and phosphorus fertilizers due to the close <br /> proximity of(shallow)groundwater.A complete <br /> agronomic evaluation shall be conducted prior to <br /> plantings to establish rates of fertilizer and herbicide <br /> applications. <br /> Transportation And Circulation <br /> 4.4.1 The project would generate additional vehicle trips, 4.4.1 a Although the intersection of Koster and Blewelt Roads is Less than Significant <br /> primarily haul truck traffic,on project area roadways.The anticipated to operate at acceptable levels of service with <br /> added traffic would affect traffic operating conditions.This project implementation,the intersection will require <br /> would be a potentially significant impact.(PS) widening to accommodate truck turning movements if <br /> access to the mining site is provided via Koster Road,or <br /> if Haul Route Option 2 is allowed. If the County allows the <br /> use of this haul route,the project sponsor would fund its <br /> fair share of this measure as a condition of approval of <br /> the project.Peters Engineering Group conducted a Fair- <br /> Share Percentage analysis as part of its Traffic Impact <br /> Study for this project.The fair share percentage provides <br /> a measure of the project's share of the anticipated future <br /> improvements to the transportation network.This <br /> analysis is contained in Appendix C. <br /> 4.4.1 b As a condition of approval,once in production,the <br /> applicant will be required to contribute an equitable share <br /> of the cost of the construction of a new interchange at SR <br /> 132 and Bird Road. The fee will consist of an initial <br /> contribution and a per ton—delivered-off-site fee,based <br /> on the equitable share of the project's traffic impact and <br /> quantity of delivered material. Caltrans has approved a <br /> RMC Parc Vernalis auany Mining and Reclamation Project 2-7 ESA I Project No.203015 <br /> Draft Environmental Impact Report May 2006 <br />