Laserfiche WebLink
2.Executive Summary <br /> TABLE 2.1 (CONTINUED) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> Environmental Impact Mitigation Measures Level of Significance <br /> (Level of Significance Prior to Mitigation) After Mitigation <br /> Project Study Report for an interchange to replace the <br /> existing intersection. The proposed interchange is <br /> expected to mitigate the cumulative impacts to the <br /> intersection. <br /> 4.4.2 The project would increase traffic on regional roadways in 4.4.2 Once in production and if the interchange is not Less than Significant <br /> the project vicinity.This would be a potentially significant completed,the project sponsor will be required to <br /> impact.(PS) contribute an equitable share of the cost of the widening <br /> of SR 132 to two lanes in each direction between I- 580 <br /> and McCracken Road or a comparable mitigation <br /> proposed by Caltrans.The fee will consist of an initial <br /> contribution and a per ton—delivered-off-site fee,based <br /> on the equitable share of the project's traffic impact and <br /> quantity of delivered material. With construction of two <br /> lanes in each direction,SR 132 is expected to experience <br /> acceptable levels of service through the year 2025. <br /> 4.4.3 If Haul Route Option 2 is approved,project-generated 4.4.3 If Haul Route Option 2 is approved,the project applicant Less than Significant <br /> haul truck traffic would rause an increased traffic safety would be required to fund the project's fair share <br /> hazard at the intersection of State Route 132 and Koster contribution to necessary upgrades to the intersection of <br /> Road.This would be a potentially significant impact.(PS) SR 132 and Koster Road(including left-turn lanes and <br /> acceleration/decelerafion lanes). <br /> 4.4.4 Project-generated traffic could result in accelerated 4.4.4 Pavement Upgrades and Replacement.As a condition of Less than Significant <br /> pavement deterioration on study area roadways.This approval,the project applicant or successor-in-interest <br /> would be a potentially significant impact.(PS) will be required to enter into an agreement with the San <br /> Joaquin County Department of Public Works regarding <br /> the replacement/upgrade and maintenance of roadways <br /> affected by the project.Upgrades and replacements to <br /> the Traffic Index identified in Table 4.4-5 of the EIR will <br /> be completed unless the need for a different Traffic Index <br /> is indicated by future counts. <br /> Bird Road Between Blewett Road and SR 132: The project <br /> applicant or successor-in-interest shall contribute its fair <br /> share to future pavement upgrades on this road segment. <br /> SR 132 Between Interstate 580 and McCracken Road: <br /> The project applicant or successor-in-interest shall be <br /> required to contribute to the cost of pavement structural <br /> section upgrades between Bird Road and Interstate 5. <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 2-8 ESA I Project No203015 <br /> Draft EnNronmental Impact Report May 2006 <br /> I <br /> 1 1 1 1 1 . I I I I t A I l l I t <br />