Laserfiche WebLink
r r r r r r r r r r r r r r r r r r r <br /> 2.Executive Summary <br /> TABLE 2.1 (CONTINUED) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> Environmental Impact Mitigation Measures Level of Significance <br /> (Level of Significance Prior to Mitigation) After Mitigation <br /> The contribution to upgrades would be required for both <br /> directions of travel based on Haul Route Option 1,and <br /> only the eastbound direction of travel for Haul Route <br /> Option 2. <br /> Blewett Road Between Bird Road and Interstate 5: The <br /> project applicant or successor-in-interest shall contribute <br /> its fair share to future pavement upgrades on this road <br /> segment. <br /> Blewett Road Between Interstate 5 and Koster Road: <br /> The project applicant or successor-in-interest shall <br /> contribute its fair share to future pavement upgrades on <br /> this road segment. <br /> Koster Road Between Blewett Road and SR 132: The <br /> project applicant would be solely responsible for funding <br /> the required upgrades on this road segment if Haul Route <br /> Option 2 were selected. The project will not utilize this <br /> portion of Koster Road with Haul Route Option 1. <br /> 4.4.5 Implementation of Haul Route 3 could result in level of No mitigation is required. <br /> service impacts at the intersection of SR 33 and Welty <br /> Road. This impact is less than significant.(LS) <br /> Noise <br /> 4.5.1 Noise generated by mining equipment and excavation 4.5.1 a At the start of stripping operations for each phase,the Significant <br /> activities would result in an increase in the ambient noise applicant shall construct an earthen berm along the <br /> levels at the nearest residence(s).This would be a portions of the project site that face sensitive receptors <br /> significant impact.(S) located within 2,000 feet of mining operations for that <br /> phase.This includes residencesR4 and R5 northeast of <br /> Phase IV(this earthen berm would also attenuate noise <br /> to residences R5,R6,and R7)and residences R1,R2, <br /> and R3,west of Phase III and southwest of Phase V.The <br /> _ sound barriers must be at sufficient height(approximately <br /> 10 feet)to block the line of sight to the nearest sensitive <br /> receptor.If continuous earthen berms of adequate size <br /> are already in place,additional berms would not needed. <br /> 4.5.1 b The Applicant shall conduct additional noise <br /> measurements after the completion of initial stripping <br /> RMC Pachc vemalie Quarry Mining and Reclamation project 2-9 ESA I Project No.203015 <br /> Draft Environmental Impact Report May 2006 <br />