r r r r r r r r r r i i r r r r r r r <br /> 2.Executive Summary <br /> TABLE 2-1 (CONTINUED) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> Environmental Impact Mitigation Measures Level of Significance <br /> (Level of Significance Prior to Mitigation) After Mitigation <br /> water flows from the reach of Hospital Creek downstream mining both sides with a 100-foot setback from the Creek under Mining Plan Option 2. <br /> of the proposed mining operations leading to depletion of centerline of the creek to the top of the mining slope. Implementing Mitigation Measure <br /> flows to downstream receiving water bodies,reduction of 4.6.6 would ensure that significant <br /> surface water available for localized infiltration,or impacts related to Mining Plan <br /> elimination of adequate water flow for aquatic and Option 2 would not occur,However, <br /> riparian habitats.This would be a significant impact.(S) if Mitigation Measure 4.8.6 is not <br /> implemented and Mining Plan <br /> Option 2 is identified as the <br /> preferred approach to mining <br /> adjacent to Hospital Creek,then the <br /> impacts to hydrology,as described <br /> above,would remain significant. <br /> 4.8.7 Mining operation would alter the natural,preferential flow No mitigation is required. <br /> pathways of surface water resulting in areas of localized <br /> onsite flooding.This is a less-than-significant impact.(LS) <br /> Biological Resources <br /> 4.9.1 Project activities could potentially result in direct and 4.9.1 The project applicant shall ensure that any loss of waters Less than Significant <br /> indirect impacts to"waters of the U.S.".This is a of the U.S.shall be compensated for by the preservation <br /> potentially significant impact.(PS) or creation of similar habitat at a ratio no less than 1:1, <br /> prior to construction.This preservation and/or creation of <br /> wetlands may occur either on-site,at an off-site location, <br /> or at an ACOE approved mitigation bank.To ensure <br /> mitigation of habitat similar to that impacted by Mining <br /> Plan Option 2,if this mitigation occurs off-site and not at <br /> a mitigation bank,the mitigation shall be located on <br /> alluvial fans or terraces in either western San Joaquin or <br /> Stanislaus Counties.Permits secured for the project may <br /> require higher ratios. <br /> 4.9.2 Project activities could result in adverse impacts to 4.9.2a Conditions on the project site currently provide habitat for Less than Significant <br /> special status-species covered under the SJMSCP.This San Joaquin kit fox.Site conditions will change over the <br /> is a potentially significant impact.(PS) 26-to 60-year life of the project;therefore,the following <br /> mitigation measures shall be implemented prior to <br /> implementation of any Phase of mining. <br /> RMC Pacific vernalis Ouany Mining and Reclamation Protect 2-17 ESA/Project No.2(I(13015 <br /> Draft Environmental Impact Report May 2006 <br />