Laserfiche WebLink
r r r I r r r r r r r r r r i I 1 r <br /> 2.Executive Summary <br /> TABLE 2-1 (CONTINUED) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> Environmental Impact Mitigation Measures Level of Significance <br /> (Level of Significance Prior to Mitigation) After Mitigation <br /> tricolored blackbirds are nesting in the silage,the <br /> entire field shall not be harvested until the colony is <br /> no longer active. <br /> 4.9.2c Conditions in the Proposed Project area currently provide <br /> breeding habitat for Swainson's hawk and white-tailed <br /> kite.Site conditions will change over the 26-to 60-year <br /> life of the project,therefore,the following mitigation <br /> measures shall be implemented prior to implementation <br /> of any Phase of mining.For any Phase where ground- <br /> disturbing activities would commence during the raptor <br /> breeding season(March 15 through August 31),the <br /> applicant shall: <br /> (1) Comply with the SJMSCP.For Phases <br /> complying with the SJMSCP,no further mitigation <br /> is required,or <br /> (11) For Project Phases not complying with the SJMSCP, <br /> the applicant shall conduct pre-construction surveys <br /> for nesting raptors in suitable habitat within one-half <br /> mile(for Swainson's hawk)and 500 feet(for white- <br /> tailed kite)of the Phase boundaries.Surveys shall <br /> begin either at the beginning of the breeding season, <br /> or four weeks prior to beginning mining activities in <br /> the Phase,whichever is later.If nesting raptors are <br /> recorded within these buffers,the applicant shall not <br /> permit construction activities within these buffers <br /> except in consultation with CDFG. _ <br /> 4.9.2d Conditions at the project site currently provide low <br /> suitability habitat for burrowing owls.Site conditions will <br /> change over the 26-to 60-year life of the project; <br /> therefore the following mitigation measures shall be <br /> implemented prior to implementation of any Phase of <br /> mining: <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 2-21 ESA/Project No 203015 <br /> Draft EnOummental Impact Report May 2006 <br />