My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.Executive Summary <br /> TABLE 2.1 (CONTINUED) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> Environmental Impact Mitigation Measures Level of Significance <br /> (Level of Significance Prior to Mitigation) After Mitigation <br /> (1) Comply with the SJMSCP.For Phases <br /> complying with the SJMSCP,no further mitigation <br /> is required,or <br /> (II) For Project Phases not covered under the SJMSCP, <br /> a habitat assessment for burrowing owls shall be <br /> conducted in the year prior to implementation of <br /> each Phase.Burrowing owl site assessments are <br /> generally only valid for one year.The site <br /> assessment for burrowing owls shall be conducted <br /> by a qualified biologist according to the CDFG Staff <br /> Report on Burrowing Owl Mitigation(CDFG, 1995), <br /> as updated.If warranted by the site assessment <br /> protocol(CDFG, 1995),as updated,pre-construction <br /> surveys for burrowing owls shall be conducted in <br /> suitable habitat within 500 feet of each Phase's <br /> boundaries.These surveys require two site visits, <br /> once in December to January,and once April 15 to <br /> July 15. <br /> (III) If occupied burrows are recorded within a 500-foot <br /> buffer from the Phase,the project shall avoid mining <br /> operations within a 160-foot buffer of active burrows <br /> from September 1 to January 31,and within a 250- <br /> foot buffer from February 1 to August 31.If <br /> avoidance is not possible,then measures may also <br /> include(in consultation with CDFG)passive <br /> relocation and destruction of occupied burrows <br /> during the non-breeding season(October—January). <br /> To mitigate for the loss of any burrows,the applicant <br /> shall enhance and/or create burrows at a 2:1 ratio at <br /> a protected site in San Joaquin or Stanislaus <br /> Counties.The protected site shall include 6.5 acres <br /> of foraging habitat per occupied burrow lost <br /> contiguous with occupied burrow sites to <br /> compensate for the loss of each pair of breeding <br /> owls,or single,unpaired resident owl. <br /> 4.9.3 The project will not conflict with any applicable habitat No mitigation is required. <br /> conservation plan or natural community conservation <br /> plan.This would be a less-than-significant impact.(LS) <br /> RMC Pecffic Vemalis Quarry Mining and Reclamation Project 2-22 ESA I Project No.203015 <br /> Draft Environmental Impact Report May 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.