Laserfiche WebLink
I r r r r r r <br /> 2.Executive Summary <br /> TABLE 2-1 (CONTINUED) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> Environmental Impact Mitigation Measures Level of Significance <br /> (Level of Significance Prior to Mitigation) After Mitigation <br /> plan.This would be a less-than-significant impact.(LS) <br /> 4.9.4 The project will not have a substantial adverse effect on No mitigation is required. <br /> any riparian habitat or other sensitive natural community <br /> identified in local or regional plans,policies,or <br /> regulations or by the CDFG or USFWS.This would be a <br /> less-than-significant impact.(LS) <br /> 4.9.5 The project will not interfere substantially with the No mitigation is required. <br /> movement of any native resident or migratory fish or <br /> wildlife species or with established native resident or <br /> migratory wildlife condors,or impede the use of native <br /> wildlife nursery sites.This would be a less-than- <br /> significant impact.(LS) <br /> 4.9.6 The project will not conflict with any local policies or No mitigation is required. <br /> ordinances protecting biological resources.This would be <br /> a less-than-significant impact.(LS) <br /> Cultural Resources <br /> 4.10.1 Damage to previously unidentified buried archaeological 4.10.1 Stop work if cultural resources are discovered during Less than Significant <br /> remains during project construction.This would be a project construction. <br /> potentially significant impact.(PS) <br /> If potentially significant cultural resources are discovered <br /> during ground-disturbing activities associated with project <br /> preparation,construction,or completion,work shall halt in <br /> that area until a qualified archaeologist can access the <br /> significance of the find,and,if necessary,develop <br /> appropriate treatment measures in consultation with San <br /> Joaquin and/or Stanislaus Counties and other <br /> appropriate agencies and individuals. <br /> 4.10.2 Damage to previously unidentified human remains during 4.10.2 Comply with state laws pertaining to the discovery of Less than Significant <br /> project construction.This would be a potentially human remains. <br /> significant impact.(PS) <br /> If human remains of Native American origin are <br /> discovered during project construction,it is necessary to <br /> comply with state laws relating to the disposition of Native <br /> American burials,which fall within the jurisdiction of the <br /> RMC Pacific Vemalis Quant'Mining and Radama5on Pmject 2-23 ESA/Project Na.203015 <br /> Draft EnNmnmental Impad RePmt May 2005 <br />