Laserfiche WebLink
2.Executive Summary <br /> TABLE 2.1 (CONTINUED) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> Environmental Impact Mitigation Measures Level of Significance <br /> (Level of Significance Prior to Mitigation) After Mitigation <br /> the County has designated mining as an acceptable use <br /> on agricultural land. This would be a less-than-significant <br /> impact.(LS) <br /> 6.2 The project when combined with other large-scale mining No mitigation is required. <br /> operations in the area,would not add incrementally to the <br /> cumulative loss of agricultural production in the area.This <br /> is a less-than-significant impact.(LS) <br /> 6.3 The cumulative increase in traffic volumes associated 6.3.1 Implement Mitigation Measures 4.4.1a,4.4.1b,4.4.2, Less than significant <br /> with operation of the mine and past,present,and future 4.4.3,4.4.4,and 4.4.5 to mitigate the project's <br /> projects in the project area would result in increased incremental contribution to cumulative traffic impacts. <br /> impacts on area roadways and/or intersections. This <br /> would be a potentially significant impact.(PS) <br /> 6.4 The project will result in increased traffic volumes that in 6.4.1 Implement Mitigation Measure 4.6.2 to reduce the Significant <br /> turn will cause an incremental effect on air quality that is project's incremental contribution to cumulative air quality <br /> cumulatively considerable when considered along with impacts. <br /> past,present,and future projects in the project area. The <br /> combined impact of those projects on air quality would be <br /> a significant impact.(S) <br /> 6.5 Traffic noise levels resulting from the increase in traffic 6.5.1 Implement Mitigation Measure 4.5.3. Significant <br /> volumes associated with operation of the mine will be <br /> cumulatively considerable when considered along with <br /> past,present,and future projects in the project area, <br /> which will result in increased noise levels at residences <br /> located along truck haul routes. The cumulative impact <br /> would be significant.(S) <br /> 6.6 The slope instability hazards would remain specific to the No mitigation is required. <br /> proposed RMC project site and be localized with the _ <br /> active mining area and therefore would not contribute to a <br /> region-wide cumulative slope instability condition.This <br /> would be a less-than-significant impact.(LS) <br /> 6.7 With mitigation,the project would not contribute to 6.7.1 Implement Mitigation Measures 4.8.1a,4.8.1b,4.8.2,and Less than significant <br /> cumulative,regional adverse impacts on the lower Tulare 4.8.3 to mitigate the project's incremental contribution to <br /> Formation aquifer. Cumulative impacts would be groundwater supply and quality impacts. <br /> potentially significant.(PS) <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 2-27 ESA I Project No.203015 <br /> Draft Environmental Impact Report May 2006 <br />