Laserfiche WebLink
5.Mitigation Monitoring and Reporting Program <br /> TABLE 5-1 <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> CEMEX VERNALIS QUARRY PROJECT <br /> Mitigation Measure Responsible Party Monitor Timing Sign Off <br /> 4,11 HAZARDS AND HAZARDOUS MATERIAL <br /> 4.11.1:If contaminated soil and/or groundwater are encountered orsuspected contamination is Applice.rt C-DD (plus Rlti'4C[3 Ongoing <br /> encountered during site Gearing,construction activities,and mining activities,work shall be halted in the or DTSC or CUPA) <br /> area of concem.The Applicant shall determine the type and extent of the contamination by consulting with <br /> the appropriate regulatory agencies(RWQCB,DTSC,and/or the San Joaquin or Stanislaus County Health <br /> Department)and implementing any necessary measures,such as soil and/or groundwater sampling and <br /> analysis.If required by the regulatory agencies,a remediation plan shall be implemented either in <br /> conjunction with or prior to continued project construction and/or mining activities. <br /> 4.11.2:The project applicant shall ensure that all contractors and employees immediately control the Applicant CDD(plus PW or Ongoing <br /> source of any leak and immediately contain any spill utilizing appropriate spill containment and DES or RWQCB) <br /> countermeasures. If required by any regulatory agency,contaminated media shall be collected and <br /> disposed of at an offsite facility approved to accept such media.In addition,all precautions required <br /> by the RWQCB issued NPDES construction activity storm water permits would be taken to ensure <br /> that no hazardous materials enter any nearby waterways. <br /> 4.11.4:The silt ponds and the mining pits proposed as a part of the project should be properly Applicant CDD and mosquito Prior to grading of <br /> designed and maintained so that they do not breed mosquitoes.The design and maintenance of the abatement district silt ponds <br /> basins should be done in consultation with the San Joaquin County Mosquito Abatement District and <br /> the East Side Mosquito Abatement District in Stanislaus County, <br /> 4.12 VISUAL RESOURCES <br /> 4.12.2: Features tall enough to be seen above the visual screening(processing plant,conveyor Applicant CDD Prior to operating <br /> towers,loading hoppers,etc.)shall be painted in earthtones to minimize their visibility but still must processing plant <br /> remain visible to air traffic in the area such as crop dusters. <br /> Cemex Vemalis Quarry Mining and Reclamation Project 5-13 ESA 1203015 <br /> Final Environmental Impad Report June 2008 <br />