Laserfiche WebLink
5.Mitigation Monitodng and Reporting Program <br /> TABLE 5-1 <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> CEMEX VERNALIS QUARRY PROJECT <br /> Mitigation Measure Responsible Party Monitor Timing Sign Off <br /> III. If silage crops are grown on project land prior to being mined or when reclaimed,these crops <br /> shall be surveyed by a biologist prior to harvesting. If tricolored blackbirds are nesting in the <br /> silage,the entire field shall not be harvested until the colony is no longer active. <br /> 4.9.2c:Conditions in the Proposed Project area currently provide breeding habitat for Swainson's Applicant CDD and SJCOG Prior to each phase <br /> hawk and white-tailed kite.Site conditions will change over the 26-to 60-year life of the project, (CDD and CDFG for of mining that <br /> therefore,the following mitigation measures shall be Implemented prior to Implementation of any any phases not would begin <br /> Phase of mining.For any Phase where ground-disturbing activities would commence during the covered under excavation March <br /> raptor breeding season(March 15 through August 31),the applicant shall: SJMSCP) 15—August 31 <br /> (1) Comply with the SJMSCP.For Phases complying with the SJMSCP,no further mitigation <br /> is required.For phases not covered under the SJMSCP(at applicant's option or for potential <br /> habitat outside of the SJMSCP area),the following apply: <br /> (II) For Project Phases not complying with the SJMSCP,the applicant shall conduct pre- <br /> construction surveys for nesting raptors in suitable habitat within one-half mile(for Swainson's <br /> hawk)and 500 feet(for white-tailed kite)of the Phase boundaries.Surveys shall begin either at <br /> the beginning of the breeding season,or four weeks prior to beginning mining activities in the <br /> Phase,whichever is later. If nesting raptors are recorded within these buffers,the applicant shall <br /> not permit construction activities within these buffers except in consultation with CDFG. <br /> 4.9.2d:Conditions at the project site currently provide low suitability habitat for burrowing owls.Site Applicant CDD and SJCOG Prior to each phase <br /> conditions will change over the 26-to 60-year life of the project;therefore the following mitigation (CDD and USFWS (improvement plan <br /> measures shall be implemented prior to implementation of any Phase of mining: for any phases not approval or mining <br /> (1) Comply with the SJMSCP. For Phases complying with the SJMSCP,no further mitigation covered under activity,whichever <br /> is required.For phases not covered under the SJMSCP(at applicant's option or for potential SJMSP) occurs first) <br /> habitat outside of the SJMSCP area),the following apply: <br /> (ll) For Project Phases not covered under the SJMSCP,a habitat assessment for burrowing <br /> owls shall be conducted in the year prior to implementation of each Phase.Burrowing owl site <br /> assessments are generally only valid for one year.The site assessment for burrowing owls shall <br /> be conducted by a qualified biologist according to the CDFG Staff Report on Burrowing Owl <br /> Mitigation(CDFG, 1995),as updated.If warranted by the site assessment protocol(CDFG, <br /> 1995),as updated,pre-construction surveys for burrowing owls shall be conducted in suitable <br /> habitat within 500 feet of each Phase's boundaries.These surveys require two site visits,once <br /> In December to January,and once April 15 to July 15. <br /> (III) If occupied burrows are recorded within a 500-foot buffer from the Phase,the project shall <br /> avoid mining operations within a 160-foot buffer of active burrows from September 1 to January <br /> 31,and within a 250-foot buffer from February 1 to August 31. If avoidance is not possible,then <br /> cemea vemalls Quarry boning and Reciamebon Project 5-11 ESA 1203015 <br /> Final Environmental Impact Report June 2008 <br />