My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.Mitigation Monitodng and Reporting Program <br /> TABLE 5-1 <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> CEMEX VERNALIS QUARRY PROJECT <br /> Mitigation Measure Responsible Party Monitor Timing Sign Off <br /> III. If silage crops are grown on project land prior to being mined or when reclaimed,these crops <br /> shall be surveyed by a biologist prior to harvesting. If tricolored blackbirds are nesting in the <br /> silage,the entire field shall not be harvested until the colony is no longer active. <br /> 4.9.2c:Conditions in the Proposed Project area currently provide breeding habitat for Swainson's Applicant CDD and SJCOG Prior to each phase <br /> hawk and white-tailed kite.Site conditions will change over the 26-to 60-year life of the project, (CDD and CDFG for of mining that <br /> therefore,the following mitigation measures shall be Implemented prior to Implementation of any any phases not would begin <br /> Phase of mining.For any Phase where ground-disturbing activities would commence during the covered under excavation March <br /> raptor breeding season(March 15 through August 31),the applicant shall: SJMSCP) 15—August 31 <br /> (1) Comply with the SJMSCP.For Phases complying with the SJMSCP,no further mitigation <br /> is required.For phases not covered under the SJMSCP(at applicant's option or for potential <br /> habitat outside of the SJMSCP area),the following apply: <br /> (II) For Project Phases not complying with the SJMSCP,the applicant shall conduct pre- <br /> construction surveys for nesting raptors in suitable habitat within one-half mile(for Swainson's <br /> hawk)and 500 feet(for white-tailed kite)of the Phase boundaries.Surveys shall begin either at <br /> the beginning of the breeding season,or four weeks prior to beginning mining activities in the <br /> Phase,whichever is later. If nesting raptors are recorded within these buffers,the applicant shall <br /> not permit construction activities within these buffers except in consultation with CDFG. <br /> 4.9.2d:Conditions at the project site currently provide low suitability habitat for burrowing owls.Site Applicant CDD and SJCOG Prior to each phase <br /> conditions will change over the 26-to 60-year life of the project;therefore the following mitigation (CDD and USFWS (improvement plan <br /> measures shall be implemented prior to implementation of any Phase of mining: for any phases not approval or mining <br /> (1) Comply with the SJMSCP. For Phases complying with the SJMSCP,no further mitigation covered under activity,whichever <br /> is required.For phases not covered under the SJMSCP(at applicant's option or for potential SJMSP) occurs first) <br /> habitat outside of the SJMSCP area),the following apply: <br /> (ll) For Project Phases not covered under the SJMSCP,a habitat assessment for burrowing <br /> owls shall be conducted in the year prior to implementation of each Phase.Burrowing owl site <br /> assessments are generally only valid for one year.The site assessment for burrowing owls shall <br /> be conducted by a qualified biologist according to the CDFG Staff Report on Burrowing Owl <br /> Mitigation(CDFG, 1995),as updated.If warranted by the site assessment protocol(CDFG, <br /> 1995),as updated,pre-construction surveys for burrowing owls shall be conducted in suitable <br /> habitat within 500 feet of each Phase's boundaries.These surveys require two site visits,once <br /> In December to January,and once April 15 to July 15. <br /> (III) If occupied burrows are recorded within a 500-foot buffer from the Phase,the project shall <br /> avoid mining operations within a 160-foot buffer of active burrows from September 1 to January <br /> 31,and within a 250-foot buffer from February 1 to August 31. If avoidance is not possible,then <br /> cemea vemalls Quarry boning and Reciamebon Project 5-11 ESA 1203015 <br /> Final Environmental Impact Report June 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.