My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.6 Proposed Project Components <br /> r <br /> located in Phase II will be moved to Parcel "A," moved off-site, or demolished just prior to <br /> 6' mining that phase. The other structures(mobile homes) will he removed from the site. General <br /> debris will be recycled or removed from the site using roll-off debris containers. <br /> Scrapers and dozers will remove approximately 800,000 cubic yards of topsoil during each phase <br /> and stockpile it along the perimeter setbacks. The topsoil will be used in reclamation. Scrapers <br /> and dozers will strip the overburden,using it for the construction of building pads for the <br /> structures and for screening/landscape berms. The majority of the overburden will be stockpiled <br /> and used in reclamation. Other equipment used for clearing the site would be a water truck, <br /> ` grader and loader. <br /> Silt Pond Construction <br /> While mining Phase I,the Phase IVB area would be bermed to create a temporary silt pond using <br /> Phase I and Phase IVB overburden. Once mining is completed in Phase I,it would be used for <br /> L permanent silt containment and the silt temporarily contained in the Phase IVB area would be <br /> pumped into the Phase I silt pond. Once Phase IVB and Phase IVA are mined out,those pits will <br /> also become permanent silt ponds. If additional silt storage is needed during the course of mining, <br /> L the Phase V area would be used as a silt pond. Figures 3-3 and 3-4 show the locations of the <br /> temporary silt ponds. <br /> Recycled water from the silt ponds and well water would be used for water supply. Once the silt <br /> ponds are established,decanted waters from the silt pond would be used in washing the sand and <br /> gravel, with approximately 25 percent well water being used for washing. Well water would be <br /> used in washing sand and gravel until the silt ponds are in operation. <br /> L Landscaping and Screening <br /> Within a 50-foot setback along the northern portion of Koster Road and along Blewett Road,a <br /> landscape berm will be constructed out of overburden and topsoil removed from the initial mining <br /> r- phases. The berm along Koster Road will commence on the south side of Phase IX and extend <br /> northerly to Blewett Road with a break at the main entrance gate. The berm along Blewett Road <br /> will connect with the berm at the intersection with Koster Road and will extend easterly to the <br /> northeast comer of the Phase IVB area, and then extend approximately 700 feet along the easterly <br /> portion of the Phase IVB area. Existing trees will remain along a portion of the easterly side of <br /> the Phase IVB area. <br /> The applicant has completed a landscape plan that is available for review at the San Joaquin <br /> County Community Development Department, 1810 East Hazelton Drive, Stockton, California, <br /> and is incorporated herein by reference. The landscape berm will include a double row of trees <br /> and non-irrigated hydroseed mix that will serve to screen in part the plant facilities and act as a <br /> L <br /> noise barrier.The trees that could be included along the landscape berm include: coolibah tree <br /> (Eucalyptus microtheca), afghan pine(Pinus eldarica), Indian longleaf pine(Pinus roxburghii), <br /> L Lombardy poplar(Populus nigra Italica),and English oak(Quercus robur fastigiata). The trees <br /> would be drip irrigated by an automatic and seasonally adjusted irrigation system providing <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Proje3-13 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.