My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.Project Description — <br /> 100 percent coverage in the area of the trees.The non-irrigated hydroseed mix would include — <br /> 80 percent Zorro fescue and 20 percent rose clover. The hydroseed mix would be applied at <br /> 55 pounds per acre. <br /> Site Access <br /> A paved entrance to the plant site would be constructed off of Koster Road approximately — <br /> 2,100 feet south of Blewett Road. The driveway will be paved at least 100 feet into the plant site. <br /> The on-site equipment and material haul roads would be unpaved. All employee and customer <br /> parking would be located at a designated parking zone, surfaced with asphalt and located on the — <br /> site within the Phase IX area, the plant site. Secondary access will be off Blewett Road at the <br /> Phase IVB area. The applicant proposes to participate in the funding of a new intersection at <br /> Interstate 5 and Blewett Road. Otherwise access to the freeways will be from Highway 132 and <br /> Bird Road. <br /> Utilities <br /> There are five known wells on the project site. Locations are shown on Figures 3-3 and 3-4, the <br /> Mining Plan (Options 1 and 2). There are three agricultural wells with a capacity of about <br /> 1,300 gallons per minute (gpm) each and two domestic wells with the capacity of 20 gpm each. <br /> Most likely Agricultural Wells No. 1 and No. 3 as well as Domestic Well No. 2 will remain <br /> operational.The other two wells will be abandoned.The wells will be connected to the plant <br /> facilities and office during the construction phase and provide water supply during the operation <br /> of the project. <br /> Grid power will be supplied by connecting to existing power at the intersection of Koster and <br /> Blewett Roads. Service will be underground on-site and a transformer will be located next to the <br /> aggregate processing site. Fuel for the asphalt plant will be provided by existing natural gas <br /> service. The Project would also utilize diesel fuel and gasoline for vehicle fuel and back-up power <br /> generation. There would he two 10,000-gallon aboveground diesel fuel tanks, and one — <br /> 3,000-gallon aboveground gasoline tank. <br /> There is no public sewer serving the project site. A new septic tank would be installed within the — <br /> plant site to service the office area and another tank would be installed to service the relocated <br /> house and barn. The existing septic tank/leach fields serving the house and barn would be <br /> removed during mining excavation. — <br /> Power, fuel and water usage are discussed below in Section 3.6.3. <br /> Site Drainage <br /> All disturbed surface runoff would either be directed to silt ponds or contained within the mining — <br /> excavations. No separate dedicated storm water retention ponds are proposed. <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 3-14 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br /> J <br />
The URL can be used to link to this page
Your browser does not support the video tag.