3.6 Proposed Project Components <br /> TABLE 3-1 <br /> PROPOSED PROJECT FEATURES AND CHARACTERISTICS <br /> Volume of Maximum <br /> Total Pit Volume of Volume of Material Depth of <br /> r Mining Volume Overburden Top Soil Extracted* Extraction <br /> Operation Acres (Cubic Yards) (Cubic Yards) (Cubic Yards) (Cubic Yards) (Feet) <br /> Phase 1 37.3 4,801,000 376,108 45,133 4,379,759 90 <br /> Phase II 84.8 11,882,000 855,067 102,608 10,924,325 92 <br /> Phase 111 73.4 11,385,000 740,117 88,814 10,556,069 105 <br /> Phase IV 75.4 9,166,000 760,283 91,234 8,314,483 94 <br /> r <br /> Phase V 83.1 15,869,000 837,925 100,551 14,930,524 116 <br /> Phase VI 111.5 20,796,000 1,124,292 134,915 19,536,793 105 <br /> Phase VII 77.6 11,120,000 782,467 93,896 10,243,637 105 <br /> Phase VIII 77.6 10,035,000 782,467 93,896 9,158,637 98 <br /> Phase IX 38 5,132,000 383,167 45,980 4,702,853 88 <br /> Total 659 100,189,000 6,644,917 797,390 92,746,693 <br /> r ' Material Extracted equals total pit volume less overburden and topsoil - <br /> SOURCE: Spmardi Associates,2004. <br /> V <br /> TABLE 3-2 <br /> PROPOSED PROJECT MINING AND RECLAMATION SCHEDULE <br /> Mining Product Years to Mine Years to Mine Range of Years Range of Years <br /> Operation (Tons) (1.7 mtnslyr) (4.0 mtnslyr) to Mine to Reclaim <br /> Phase I 4,468,000 3 1 0 to 3 59 to 60 <br /> Phase 11 11,006,000 6 3 1 to 9 4 to 12 <br /> Phase III 11,814,000 7 3 4 to 16 8 to 18 <br /> Phase IVa 5,445,900 3 1 7 to 19 58 to 60 <br /> Phase IVb 4,139,000 2 1 8 to 22 58 to 60 <br /> Phase V 16,759,000 10 4 9 to 32 15 to 33 <br /> Phase VI 21,769,000 13 5 13 to 45 18 to 46 <br /> Phase VII 8,605,000 5 2 21 to 56 23 to 57 <br /> Phase IX 5,086,000 3 1 23 to 59 24 to 60 <br /> Total 99,477,900 59 25 25 to 59 <br /> SOURCE: Reclamation Plan,RMC Pacific Materials,Inc.Vemalis Quarry,October 2003 <br /> V <br /> Pit Operations <br /> A 7i/z-yard excavator will excavate material from the pit and load the pit run material into 40-ton <br /> off-road haul trucks. The haul trucks will transport the pit run material to a feed hopper where the <br /> material will be dumped and fed to a series of field conveyors. The field conveyors will transport <br /> the pit run material from the pit bottom to the aggregate plant. The feed hopper and field <br /> conveyors will be moved as new phases are excavated. The series of field conveyors will be <br /> i. <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 3-19 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br /> r <br />