3.Project Description <br /> • Primary crusher <br /> • Secondary crusher <br /> • Screen decks <br /> • Power generator trailer _ <br /> • Conveyors <br /> • Office trailer <br /> • Stacker conveyor <br /> Portable office trailers will be placed during the construction phase in the Phase IX area just east <br /> of the main entrance. The offices will also serve as a scale house and will be approximately <br /> 1,800 square feet in size. Three scales approximately 80 feet long will be placed on concrete <br /> foundations. Wheel washers would be placed between the scales and the main entrance to ensure <br /> that tracking of dirt onto Koster Road is kept to a minimum. <br /> 3.6.2 Mining Operations <br /> Phasing <br /> Mining would be divided into nine phases beginning with Phase I. While mining Phase I,the — <br /> Phase IV area would be temporarily bermed to create a silt pond using Phase I and Phase IV <br /> overburden. Once mining is completed in Phase I, it would be used for permanent silt <br /> containment and the silt temporarily contained in Phase IV would be pumped into the Phase I silt <br /> pond. Mining would continue to Phase II, III,IV, and so on until all phases have been mined. <br /> Once mining is completed in the Phase IV area,the pit would be used as a permanent silt pond <br /> along with the silt pond in the Phase I area. If additional silt storage is needed during the course — <br /> of mining, the Phase V area would be used as a silt pond.Phase IX will he mined once the <br /> structures including the aggregate plant are demolished and removed.The material excavated <br /> from Phase IX will be processed by a portable plant located on the capped settling pond in the <br /> Phase IV area. Tables 3-1 and 3-2 describe the elements of the mine phases. <br /> Top Soil and Overburden Removal <br /> The total amount of top soil is approximately 800,000 cubic yards,an average of nine inches <br /> thick(i.e., 800,000 cubic yards over 659 acres). Topsoil would be stripped using scrapers and <br /> stockpiled in berms for use in landscape areas and final reclamation. The largest amount of <br /> topsoil stockpiled at one time would be approximately 50,000 cubic yards and will vary as new — <br /> areas are opened up and others reclaimed. <br /> According to estimates included in Table 3-1,above,the total amount of overburden is — <br /> approximately 6.6 million cubic yards. The overburden will be stripped by scrapers and <br /> stockpiled in berms, including the landscape berms, prior to use in reclamation.The berms will be <br /> located along the perimeter setbacks. — <br /> RMC Pacific vemalis Quarry Mining and Reclamation Project 3-18 ESA 1203015 <br /> Draft Environmental Impact Report May 2006 <br />