My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.Project Description <br /> • Primary crusher <br /> • Secondary crusher <br /> • Screen decks <br /> • Power generator trailer _ <br /> • Conveyors <br /> • Office trailer <br /> • Stacker conveyor <br /> Portable office trailers will be placed during the construction phase in the Phase IX area just east <br /> of the main entrance. The offices will also serve as a scale house and will be approximately <br /> 1,800 square feet in size. Three scales approximately 80 feet long will be placed on concrete <br /> foundations. Wheel washers would be placed between the scales and the main entrance to ensure <br /> that tracking of dirt onto Koster Road is kept to a minimum. <br /> 3.6.2 Mining Operations <br /> Phasing <br /> Mining would be divided into nine phases beginning with Phase I. While mining Phase I,the — <br /> Phase IV area would be temporarily bermed to create a silt pond using Phase I and Phase IV <br /> overburden. Once mining is completed in Phase I, it would be used for permanent silt <br /> containment and the silt temporarily contained in Phase IV would be pumped into the Phase I silt <br /> pond. Mining would continue to Phase II, III,IV, and so on until all phases have been mined. <br /> Once mining is completed in the Phase IV area,the pit would be used as a permanent silt pond <br /> along with the silt pond in the Phase I area. If additional silt storage is needed during the course — <br /> of mining, the Phase V area would be used as a silt pond.Phase IX will he mined once the <br /> structures including the aggregate plant are demolished and removed.The material excavated <br /> from Phase IX will be processed by a portable plant located on the capped settling pond in the <br /> Phase IV area. Tables 3-1 and 3-2 describe the elements of the mine phases. <br /> Top Soil and Overburden Removal <br /> The total amount of top soil is approximately 800,000 cubic yards,an average of nine inches <br /> thick(i.e., 800,000 cubic yards over 659 acres). Topsoil would be stripped using scrapers and <br /> stockpiled in berms for use in landscape areas and final reclamation. The largest amount of <br /> topsoil stockpiled at one time would be approximately 50,000 cubic yards and will vary as new — <br /> areas are opened up and others reclaimed. <br /> According to estimates included in Table 3-1,above,the total amount of overburden is — <br /> approximately 6.6 million cubic yards. The overburden will be stripped by scrapers and <br /> stockpiled in berms, including the landscape berms, prior to use in reclamation.The berms will be <br /> located along the perimeter setbacks. — <br /> RMC Pacific vemalis Quarry Mining and Reclamation Project 3-18 ESA 1203015 <br /> Draft Environmental Impact Report May 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.