Laserfiche WebLink
3.6 Proposed Project Components <br /> No <br /> downstream end through a concrete overflow structure. The benefit of this option is <br /> �. that the basin could then be used to control and manage flows and storm water along <br /> Hospital Creek and could act as a groundwater recharge basin. Under this option, <br /> reclamation of Phases V and VI would be a large seasonal pond. <br /> Public Safety <br /> ` The Applicant proposes to implement measures to prevent accidental and unauthorized access to <br /> the mining areas. The Applicant would install and maintain fencing,consistent with the San <br /> Joaquin County Code,and warning and no-trespassing signs around the perimeter of the property. <br /> Gates would be installed and roving security patrols would be employed during non-operational <br /> hours. Signs would be installed for regular traffic and delivery routes and lighting would be <br /> installed and maintained for traffic and safety purposes. Haul roads would be graded, watered, <br /> r. and maintained with berms for traffic safety. Slopes would be fenced to prevent public access and <br /> replaced at 2:1 per County Code requirements. Equipment, roads,fences, and security would be <br /> maintained in compliance with County Code, Mine Safety and Health Administration(MSHA) <br /> regulations,and Cal-OSHA regulations. <br /> Petroleum products and other hazardous materials would be stored on the site, including gasoline <br /> and diesel fuel, oil and grease, waste oil,antifreeze, used oil filters, solvents,batteries, gases, <br /> ready-mix admixtures. All petroleum products and hazardous materials would be stored in <br /> Lregulatory agency approved containers and secondary containment. A Hazardous Materials <br /> Management Plan (HMMP) would be prepared and submitted to both the San Joaquin County <br /> Environmental Health Department and the Stanislaus County Environmental Health Department. <br /> This plan would include an inventory of hazardous materials and hazardous wastes,how these <br /> materials are handled, how the wastes are disposed, and a hazardous materials and wastes <br /> emergency response plan.The HMMP would be located on the property at all times and <br /> ` employees would be trained on the details of the plan. <br /> Dust Control <br /> The potential sources of fugitive dust in the mining operations include: <br /> • Pit face excavation <br /> • Loading of haul trucks <br /> • Dumping material into the feed hopper <br /> • Transfer points on the field conveyors <br /> • Pit haul roads <br /> The mining operation will regulated by SJVAPCD Rule 8020. Dust suppression for the <br /> ` operations will include the watering of mining areas and haul roads by water trucks as necessary <br /> to reduce dust. Approximately 80,000 gallons per day of water will be used for dust suppression <br /> during construction,operation, and reclamation. In the mining operations the water will be <br /> applied by a water truck at the pit face and along the haul roads. Spray bars will be located at the <br /> feed hopper and at the field conveyor transfer points. A bag house will be used on most crushers, <br /> dry screens, transfer points,and.all plants to control airborne dust and emissions. <br /> i <br /> V RMC Pacific Vernalis Quarry Mining and Reclamation Proj3-21 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br />