Laserfiche WebLink
3.Project Description ,. <br /> Hours of Operation <br /> The project's hours of operation will be 24 hours per day, 6 days a week(Monday through <br /> Saturday)with maintenance on Sundays. However, overnight operations would only occur as <br /> needed for special contract jobs requiring nighttime delivery. <br /> 3.6.3 Processing Facility <br /> The processing facility would consist of conveyors, screens,crushers,and scrubbers.There would <br /> be a Ready Mix Concrete Plant and an Asphalt Plant. There would be a quality control facility — <br /> located at the plant site. A portable,concrete recycling plant, owned and operated by an outside <br /> contractor, would be brought in intermittently into the middle of the plant site to produce base. <br /> The office would consist of a series of pre-manufactured buildings. All plant and office facilities <br /> would be constructed in the Phase IX area and would be accessed via Koster Road.There would <br /> be approximately 40 employees at the facility. The life of the processing operation would _ <br /> continue parallel to mining operations. During the final phase of mining,Phase IX, the processing <br /> plant area would be mined and a portable processing plant would be set up in the Phase IV area, <br /> which by that time would be a capped silt pond. The portable processing plant would remain in — <br /> Phase IV for the final phase of mining operations. <br /> Truck scales would be located at the processing facility and a scale house/office building that <br /> would he approximately 1,800 square feet in size would be located near the truck scales. A <br /> portable,concrete recycling plant,owned and operated by an outside vendor, would be brought in <br /> intermittently into the middle of the plant site(the Phase IX area) to produce base. Concrete — <br /> comeback and waste concrete from the batch plant would be stockpiled for recycling. <br /> Approximately 100,000 tons of material per year would be recycled. <br /> Stationary Plant <br /> The stationary plant will produce between 1.7 and 4.0 million tons of aggregate per year, — <br /> depending on market demand. All materials processed through the Vernalis plant will pass <br /> through a wet process of scrubbing,coarse and fine material washing,and screening. A certain <br /> portion of this washed material will then go through a crushing circuit, then a dry screening — <br /> process in order to produce aggregate base and asphalt materials. The production of aggregate <br /> base and asphalt products are typically a dry production process. Approximately 75 percent of the <br /> processing plant would involve a wet screening process. The wet plant would consist of <br /> scrubbers, crushers,coarse material washers,fine material washers, conveyors,and wet screens <br /> for the washing and sizing of materials. The other 25 percent of the material would be processed _ <br /> through a dry circuit that would consist of conveyors,crushers, and dry screens for the sizing of <br /> the crushed aggregates. Input from the processing facility would be approximately 1,400 tons per <br /> hour and output would be approximately 1,200 tons per hour(the 200 ton per hour difference <br /> would be due to the generation of silts and clays by the processing plant operation). <br /> Wastewater from the plant washing process would be stored in settling ponds. Settled water from _ <br /> the settling ponds would be recycled for use in the plant washing circuit. <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 3-22 ESA 1203015 <br /> Draft Environmental Impact Report May 2006 <br />