Laserfiche WebLink
4.Environmental Analysis _ <br /> Table 4.3-2 lists the active Williamson Act contracts within the proposed mining area along with — <br /> their associated renewal status. The contracts are located within San Joaquin County portion of <br /> the project site. As illustrated,two of the parcels within the proposed mining area are under non- <br /> renewal status(filed in 1995) with the contract scheduled to end in 2005. However, these parcels, <br /> consisting of approximately three acres near the southwestern corner of the project site,are the <br /> proposed site of relocation of the residence. Two parcels under Williamson Act contract comprise <br /> 156 acres(or 23 percent)of the project site. <br /> TABLE 4.3-2 <br /> SUMMARY OF WILLIAMSON ACT CONTRACTS — <br /> Property(APN) Acres Contract No. Preserve No. Status' <br /> 265-010-15 66.15 770043 R-69-C1 Renewal <br /> 265-010-16 70.71 770043 R-69-C1 Renewal <br /> 265-010-17 1.38 770043 R-69-C1 Non-renewal <br /> 265-010-18 1.65 770043 R-69-C1 Non-renewal <br /> ' A contract's status will be under renewal,non-renewal or cancellation. <br /> b Non-renewal was filed in 1994 and became effective in 1995 with contract terminating in 2005. <br /> APN=Assessors Parcel Number <br /> SOURCE: San Joaquin County,2003 <br /> A review of the subject Williamson Act contract and Chapter 9-1810 of San Joaquin County's <br /> Zoning Ordinance indicates that Quarry Operations are considered a compatible use under the — <br /> Williamson Act [Section 9-1810.3(b)(1)(W)],subject to a discretionary permit. This County <br /> ordinance,however,stipulates that on Williamson Act contract lands,the subject land be <br /> rehabilitated for agricultural use following mining, as proposed under the project. <br /> SMARA Performance Standards for Reclamation <br /> Since a large majority of the site is classified as prime farmland, SMARA reclamation standards <br /> (Title 14 of the California Code of Regulations(Section 3707))for reclamation of prime <br /> agricultural land apply to this project,but only to the project where the Williamson Act contracts — <br /> exist is there any legal mandate to reclaim to an agricultural end use. <br /> § 3707.Performance Standards for Prime Agricultural Land Reclamation. In addition to the — <br /> standards for topsoil salvage,maintenance,and redistribution,the following standards shall <br /> apply to mining operations on prime agricultural lands where the approved end use is <br /> agriculture: _ <br /> (a) Mining operations which will operate on prime agricultural lands,as defined by the <br /> U.S. Soil Conservation Service, shall return all disturbed areas to a fertility level as <br /> specified in the approved reclamation plan. <br /> (b) When distinct soil horizons are present,topsoil shall be salvaged and segregated by <br /> defined A,B,and C soil horizons. Upon reconstruction of the soil,the sequence of — <br /> horizons shall have the A atop the B,the B atop the C,and the C atop graded <br /> overburden. <br /> RMC Pacific Vernalis Ouany Mining and Reclamation Project ESA/203015 <br /> Draft Environmental Impact Report May 2506 <br />