My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.3 Agricultural Resources <br /> r <br /> (c) Reclamation shall be deemed complete when productive capability of the affected <br /> land is equivalent to or exceeds, for two consecutive crop years, that of the premining <br /> condition or similar crop production in the area. Productivity rates, based on <br /> reference areas described in the approved reclamation plan, shall be specified in the <br /> ` approved reclamation plan. <br /> (d) Use of fertilizers or other soil amendments shall not cause contamination of surface <br /> or ground water. <br /> r <br /> In addition, Section 3711 Performance Standards for Topsoil Salvage,Maintenance, and <br /> Redistribution will apply to this project. This section requires the following: <br /> r <br /> (a) All salvageable topsoil suitable for revegetation shall be removed as a separate layer <br /> from areas to be disturbed by mining operations. Topsoil and vegetation removal <br /> shall not precede surface mining activities by more than one year,unless a longer <br /> time period is approved by the lead agency. <br /> (b) Topsoil resources shall be mapped prior to stripping and the location of topsoil <br /> ` stockpiles shall be shown on a map in the reclamation plan. If the amount of topsoil <br /> needed to cover all surfaces to be revegetated is not available on site, other suitable <br /> material capable of sustaining vegetation(such as subsoil) shall be removed as a <br /> r separate layer for use as a suitable growth media. Topsoil and suitable growth media <br /> shall be maintained in separate stockpiles. Test plots may be required to determine <br /> the suitability of growth media for revegetation purposes. <br /> r (c) Soil salvage operations and phases of reclamation shall be carried out in accordance <br /> with a schedule that: (1) is set forth in the approved reclamation plan; (2) minimizes <br /> the area disturbed; and(3)is designed to achieve maximum revegetation success <br /> r allowable under the mining plan. <br /> (d) Topsoil and suitable growth media shall be used to phase reclamation as soon as can <br /> ` he accommodated by the mining schedule presented in the approved reclamation plan <br /> following the mining of an area. Topsoil and suitable growth media that cannot be <br /> utilized immediately for reclamation shall be stockpiled in an area where it will not <br /> be disturbed until needed for reclamation. Topsoil and suitable growth media <br /> ` stockpiles shall be clearly identified to distinguish them from mine waste dumps. <br /> Topsoil and suitable growth media stockpiles shall be planted with a vegetative cover <br /> or shall be protected by other equally effective measures to prevent water and wind <br /> r erosion and to discourage weeds. Relocation of topsoil or suitable growth media <br /> stockpiles for purposes other than reclamation shall require prior written approval <br /> from the lead agency. <br /> (e) Topsoil and suitable growth media shall be redistributed in a manner that results in a <br /> stable,uniform thickness consistent with the approved end use, site configuration, <br /> and drainage patterns. <br /> r <br /> California Farmland Mapping and Monitoring Program <br /> r The California Department of Conservation, under the Division of Land Resource Protection, has <br /> set up the FMMP which monitors the conversion of the state's farmland to and from agricultural <br /> use. The map series identifies eight classifications and uses a minimum mapping unit size of <br /> 10 acres. The FMMP also produces a biannual report on the amount of land converted from <br /> ` RMC Pacific Vemalis Quarry Mining and Reclamation Project .3-7 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.