My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.Environmental Analysis <br /> Although the majority of the project lands can ultimately be reclaimed to agricultural use,the pit <br /> sides would require the completion of 2:1 engineered-slopes along the perimeter of the mining <br /> area and would remain after the completion of mining. Although the soil would be reclaimed on <br /> the pit sides, the change in slope would impair the capacity of the soil. While cultivation of crops <br /> is not feasible on these steeper slopes,grazing may be possible. Grazing is an agricultural use <br /> which would be compatible with continued farming operations on adjacent lands. Under a worst- <br /> case scenario, it is estimated that the project would result in the permanent impairment of — <br /> approximately 140 acres of existing agricultural and. Of this total,it is estimated that <br /> approximately 113 acres would consist of Prime Farmland, 20.5 acres of Farmland of Statewide — <br /> Importance,and 6.3 acres of Farmland of Local Importance. <br /> Since the ultimate end use of the project site will be agriculture, no agricultural land will be — <br /> permanently converted, and the area will be reclaimed pursuant to SMARA standard for prime <br /> farmland, this impact is considered less than significant. <br /> Mitigation: No mitigation is required. <br /> Impact 4.3.2: The project would not conflict with the existing agricultural zoning of the <br /> subject properties nor with the provisions of an existing Williamson Act contract.This — <br /> would he a less-than-significant impact. <br /> A review of San Joaquin County's General Plan indicates that quarries are considered a permitted — <br /> use that can occur in the Agricultural zones.The batch plant and asphalt plant are considered <br /> accessory uses to the quant' and are not located on Williamson Act contract land. As shown in <br /> Table 4.3-2,a portion of the project site is currently under the provisions of the Williamson Act <br /> (Contract No. 77004;Preserve No. R-69-C1). Two of the four parcels(approximately three acres) <br /> under the existing contract are currently undergoing the non-renewal process and are projected to <br /> expire in 2005. These parcels (known as Parcel A) will be the site of the relocated residence. As — <br /> previously indicated,Chapter 9-1810 of the San Joaquin County Ordinance indicates that quarry <br /> operations are a compatible use under the Williamson Act, subject to a discretionary permit, <br /> provided that the subject land is rehabilitated for agricultural use[Section 9-1810.3(b)(1)(W)j. — <br /> Therefore, the project would not conflict with existing zoning or with the provisions of an <br /> existing Williamson Act contract, and the impact is considered less than significant. — <br /> Mitigation: No mitigation is required. <br /> Impact 4.3.3: Mining activities have the potential to result in offsite impacts to adjacent — <br /> agricultural lands.This would be a potentially significant impact. <br /> Active mining operations conducted during the life of the project have the potential to have a — <br /> long-term detrimental effect on adjacent agricultural operations. Off-site impacts could result <br /> RMC Pacific vemalis Duany Mining and Reclamation Project 4.3-10 ESA 1203015 <br /> Dreg Environmental Impact Report May 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.