My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.Environmental Analysis <br /> Existing traffic volumes were determined by performing manual turning movement counts at <br /> each of the project intersections.2 The manual turning movement counts were performed in <br /> December and January. A seasonal adjustment factor was applied to account for summer peak <br /> traffic. Existing peak-hour turning movement volumes at the study intersections are presented in _ <br /> Figures 13 and 14 contained in Appendix C. Traffic volumes on freeways and freeway ramps <br /> were determined by reviewing data presented in previous environmental impact reports,data <br /> available on the Caltrans web site, and balancing with existing traffic counts on State Route 132. <br /> In addition to manual turning movement counts,24-hour machine counts were performed at <br /> various locations.The results of the counts are presented in Appendix C. The results of the <br /> counts verify the assumption that PM peak-hour analyses are not required for the project. Track <br /> traffic originating from the existing mining sites in the project area was determined to be _ <br /> negligible during the PM peak hour of the adjacent roads relative to the AM peak-hour volumes. <br /> Existing Levels of Service <br /> The concepts of capacity and level of service(LOS)are central to the analysis of all traffic <br /> facilities,although their meanings and the criteria are different for intersections and roadways, <br /> and differ between signalized and unsignalized intersections. At unsignalized intersections, <br /> "Stop"or"Yield"signs are used to assign the right-of-way to one street while controlling <br /> movements from the other street(s). This forces drivers on the controlled street to select gaps in <br /> the major street flow through which they can enter and turn into the intersection, or cross entirely <br /> through the intersection. <br /> In analyzing the ability of traffic to use gaps in the major street flows,it is generally recognized <br /> that certain"critical' movements(i.e., a traffic movement that requires crossing a conflicting <br /> traffic stream)are more able to use these gaps than others. A right turn from the minor street — <br /> represents the critical movement most able to use available gaps since the driver has to be <br /> concerned with gaps in only one direction of major street traffic. A left turn from the major street <br /> is the next critical movement most able to use available gaps, followed by through movements <br /> and left turns from the minor street. Drivers making left turns from the minor street onto a major <br /> two-way street must recognize and negotiate their way through gaps in two directions of major <br /> street flows. This concept is important because it highlights the frequent capacity shortages for <br /> vehicles seeking to make left turns from a minor street onto a major street. <br /> Key input data required to analyze unsignalized intersections include geometric characteristics <br /> and peak-hour volumes. Geometric characteristics incorporated into the analysis include the <br /> number and use of lanes, lane markings,turn radii,approach angles,and sight distances. Six _ <br /> levels of service(with corresponding ranges of average vehicle delay)have been established, <br /> from LOS A(little or no delay)to LOS F(very long delays). Level of service characteristics for <br /> unsignalized intersections are defined in the 2000 Highway Capacity Manual published by the _ <br /> Transportation Research Board and are presented in Table 4.4-1. <br /> 2 The counts were perforated by the independent traffic-counting firm of Southland Car Counters(under contract <br /> with Peters Engineering Group). <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 4.4-6 ESA 1203015 <br /> Draft Environmental Impact Report May 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.